DC Blueprint data-centre intelligence

com.dcblueprintPublished by dcblueprint.comOfficial publisherv1.0.0Updated Oct 31, 2026

Dated European data-centre markets, grid connection restrictions, country rules and the live grid.

VerifiedStreamable HTTPWeb executableLocation & LifestyleFinanceData & Analytics

Overview

AI-generated overview

Remote MCP server exposing dated European data-centre intelligence: market project counts, grid connection restrictions, country rules, live grid carbon and…

What you can do
  • Look up a European data-centre market: project counts of 500 kW or more, permitted or under construction, MW by stage and leading developers
  • Check where new grid connections are paused, rationed, conditional or congested, by country or as a full ranking
  • Read national and EU rules for building and running a data centre in a country, with status, scope and upcoming deadlines
  • Get this hour's grid carbon intensity, renewable share and day-ahead price for a market, plus the cleanest window and ranking across markets
  • Search DC Blueprint's pages and return up to five results with title, date, link and summary
  • Retrieve colocation business-case inputs for one market, such as construction cost per…
When to use it
Useful when you need sourced, dated figures on European data-centre markets, grid connection constraints, country-level rules or current grid carbon and power prices, for example when screening sites or building a colocation business case.
Requirements
A remote streamable HTTP endpoint; no package or local runtime. No authentication is declared for the general tools. The business-case tool needs a personal DC Blueprint key and consumes credits.
Before you install
The business-case tool requires a personal key and spends credits, so ask only for the market and figure needed. Figures are dated snapshots from a third-party tracker and should be quoted with their date and source page. No credentials are declared for the other tools.

Installation

In SourceWeft

  1. Open DC Blueprint data-centre intelligence in the dashboard and add it to a workspace.
  2. Enable the server for the chats that should use its tools.

Web executable via Streamable HTTP. Remote servers run from the web runtime once configured in a workspace.

Use with an agent

Paste this prompt into Claude Code, Codex, Cursor or another agent — or into SourceWeft chat. The agent reads this server's install guide, shows you its publisher, endpoint and sign-in, and adds it to your client once you agree. Keys never go into a command.

Read https://sourceweft.com/mcp/com.dcblueprint%2Fdata-centres/install.md and connect the MCP server it describes to my client. Before changing any config, show me its publisher, endpoint and sign-in method and wait for my OK. Never put an API key in a command or in a file I would commit; ask me where it should come from.

Read the install guide the agent follows

Other MCP clients

Add this to your client's mcpServers config.

{
  "mcpServers": {
    "dc-blueprint-data-centre-intelligence": {
      "type": "http",
      "url": "https://dcblueprint.com/mcp"
    }
  }
}

Tools

6

data_centre_market_overview

Data-centre market overview (Europe)

Dated overview of a European data-centre market: how many data-centre projects of 500 kW or more our pipeline tracker lists and how many are permitted or being built, the stated MW by stage on each capacity basis, who develops the most of them, whether new grid connections are paused, rationed or conditional in that country, the grid carbon intensity and power price this hour, and how many data-centre rules apply. Use for questions like "data centres in Germany", "Frankfurt data centre market", "who is building data centres in Spain". Metros: London, Frankfurt, Paris, Amsterdam, Dublin, Milan, Madrid, Oslo. Countries: United Kingdom, Germany, Italy, Spain, France, Finland, Netherlands, Ireland, Norway, Sweden, Greece, Poland, Denmark, Portugal, Switzerland, Belgium, Czechia, Croatia, Estonia, Romania, Austria, Lithuania, Hungary, Latvia.

Parametersmarketrequired

grid_connection_status

Grid connection status for data centres (Europe)

Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to and when it started. Without a country: the whole ranking. Use for questions like "where can I still connect a data centre to the grid in Europe", "is Ireland's grid moratorium still in force".

Parameterscountry

data_centre_rules

Data-centre rules and deadlines by country

The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with its status, who it applies to and the next date that matters, plus upcoming deadlines. Countries: Germany, France, Ireland, Netherlands, Italy, Spain, Sweden, Finland, Denmark, Poland, United Kingdom, Belgium, Czechia, Portugal, Switzerland, Norway, Greece, Austria, Hungary, Croatia, Lithuania, Latvia, Estonia, Romania, Bulgaria, Slovakia, Slovenia, Cyprus, Malta.

Parameterscountryrequired

grid_carbon_and_price_now

Grid carbon intensity and power price now

This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its rank among 15 markets. Without a market: all markets ranked cleanest first. Markets: Germany, United Kingdom, France, Netherlands, Ireland, Italy (North), Spain, Poland, Belgium, Austria, Switzerland, Norway (NO2), Sweden (SE3), Denmark (DK1), Finland.

Parametersmarket

search_dcblueprint

Search DC Blueprint

Search DC Blueprint's pages: the four steps and the European market pages. Returns up to 5 pages with title, date, link and summary.

Parametersqueryrequired

business_case_figures

Data-centre business-case figures for one market

The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff cost, guarding, property tax, exit yield, grid wait, permitting and grid charges, with low and high. Needs a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. Ask for one market for the project at hand: every figure costs 5 credits, one figure (the "figure" argument) 1; the same answer again in the calendar month costs nothing. It is not a way to copy the catalogue market by market. Markets: Amsterdam, Athens, Berlin, Copenhagen, Dublin, Frankfurt, Helsinki, Lisbon, London, Madrid, Milan, Oslo, Paris, Stockholm, Vienna, Warsaw, Zurich. Figures: Construction cost, Colocation price, retail, Colocation price, wholesale, Colocation price, large deals, Electricity price, Cost of a site employee, Guarding and monitoring, Property tax, Exit yield, Wait for a grid connection, Permitting, Grid connection charge, Customer substation.

Parametersfiguremarketrequired

Version history

1
  1. v1.0.0LatestOct 31, 2026

Score

72% of the applicable checks met

How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.

  • Reached in the last 30 daysRequired25 pts
  • Auth declaredRequired10 pts
  • Tools listedRequired15 pts
  • DescriptionRequired15 pts
  • Logo10 pts

    Publish an icon in the registry entry.

  • Documentation15 pts

    Declare a GitHub repository with a README, or serve resource_documentation in the OAuth protected-resource metadata.

  • LicenseNot applicable

    A hosted service is used under its provider's terms, so no license is expected here. This check is left out of the percentage.