Loopgantt

com.loopganttPublished by loopgantt.comOfficial publisherv1.4.0Updated Oct 24, 2026

Create scheduled Gantt charts with critical path from a plain-language plan — no account or key.

VerifiedStreamable HTTPWeb executableProductivity & Workflow

Overview

AI-generated overview

Lets an assistant turn a task list into a scheduled Gantt chart with critical path and float.

What you can do
Creates a Gantt chart from a task list given in execution order with realistic working-day durations and dependencies, including start-to-start, finish-to-finish links and lag. schedule_project computes a schedule without storing anything, returning dates, critical path, float and project end. list_templates and get_template list and fetch industry project templates that can be adapted and passed to create_gantt.
When to use it
Use it when a plain-language task list should become a schedule or Gantt chart, such as answering what the critical path is, when the project would finish, or how much slack a task has. Also useful for starting from an industry template and adapting it.
Requirements
Runs as a remote endpoint or as an npm package locally over stdio. Creating charts and computing schedules need no account or API key; the account tools need the environment variable LOOPGANTT_API_KEY.
Before you install
LOOPGANTT_API_KEY is an optional secret that enables the account tools when set; keep it private. schedule_project stores nothing, but create_gantt creates a chart, so confirm the task details are safe to send.

Installation

In SourceWeft

  1. Open Loopgantt in the dashboard and add it to a workspace.
  2. Enable the server for the chats that should use its tools.

Web executable via Streamable HTTP. Remote servers run from the web runtime once configured in a workspace.

Use with an agent

Paste this prompt into Claude Code, Codex, Cursor or another agent — or into SourceWeft chat. The agent reads this server's install guide, shows you its publisher, endpoint and sign-in, and adds it to your client once you agree. Keys never go into a command.

Read https://sourceweft.com/mcp/com.loopgantt%2Fmcp-server/install.md and connect the MCP server it describes to my client. Before changing any config, show me its publisher, endpoint and sign-in method and wait for my OK. Never put an API key in a command or in a file I would commit; ask me where it should come from.

Read the install guide the agent follows

Other MCP clients

Add this to your client's mcpServers config.

{
  "mcpServers": {
    "loopgantt": {
      "type": "http",
      "url": "https://loopgantt.com/api/mcp"
    }
  }
}

Tools

4

create_gantt

Create a Gantt chart from a task list — no account or API key needed. YOU author the plan: list the tasks in execution order with realistic working-day durations and dependencies (0-based positions of earlier tasks; use { task, type, lag } for start-to-start/finish-to-finish links or lag). Milestones have duration 0. Only add a dependency where a task truly needs another one finished -…

ParametersnamerequiredtasksrequireddeadlineholidaysworkDaysstartDatedescription

schedule_project

Compute a schedule without storing anything: dates, critical path, float and project end for a task list (same input shape as create_gantt; name optional). Use it to answer "what is the critical path?", "when would this finish?", "how much slack does X have?". Use create_gantt when the user wants a chart they can open.

ParametersnametasksrequireddeadlineholidaysworkDaysstartDatedescription

list_templates

List LoopGantt's industry project templates with task counts and typical durations. Pick one, fetch it with get_template, adapt it, then create_gantt.

Takes no parameters.

get_template

Get one industry template by slug: its task list with durations, ready to adapt and pass to create_gantt.

Parametersslugrequired

Version history

1
  1. v1.4.0LatestSep 16, 2026

Score

65% of the applicable checks met

How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.

  • Reached in the last 30 daysRequired25 pts
  • Auth declaredRequired10 pts
  • Tools listedRequired15 pts
  • DescriptionRequired15 pts
  • Logo10 pts

    Publish an icon in the registry entry.

  • Documentation15 pts

    Declare a GitHub repository with a README, or serve resource_documentation in the OAuth protected-resource metadata.

  • License10 pts

    Declare a license in the repository or the registry entry.