Meok Rail Freight Uk Mcp

io.github.CSOAI-ORGPublished by GitHub account CSOAI-ORGv1.0.1Updated Nov 5, 2026

UK rail freight compliance — ORR licensing, ROGS safety certificate, Railway Interoperability

Overview

AI-generated overview

Local MCP server that lets an assistant check UK rail freight compliance — ORR licensing, ROGS safety certificates, interoperability and Network Rail capacity.

What you can do
  • Check ORR licence compliance against declared operations
  • Assess Railway Interoperability Regulations conformity, including NoBo, DeBo and AsBo CSM-RA roles
  • Review TSI LOC&PAS and TSI WAG subsystem evidence
  • Verify ROGS Reg 5 Part A and Part B safety certificates
  • Check RID dangerous goods classes 7 and 1
  • Assemble an evidence pack against ORR's 14 Major Issues and check Network Rail capacity and train paths under Network Code Part D
When to use it
For UK rail freight operators, safety managers, verification engineers and capacity planners who want an assistant to run structured compliance checks and prepare inspection evidence before ORR scrutiny or capacity requests.
Requirements
Runs locally as a Python package installed with pip (meok-rail-freight-uk-mcp) over stdio, configured as a desktop client command. No authentication, environment variables or headers are declared in the manifest, though the README shows an optional MEOK_HMAC_SECRET for signing responses.
Before you install
The README lists paid Starter, Pro and Fleet subscription tiers alongside a free self-host option, so check licensing before relying on it. Outputs are compliance assessments against UK regulations and should be verified by a qualified person rather than treated as regulatory sign-off. The optional MEOK_HMAC_SECRET is a secret to keep out of shared configuration.

Installation

In SourceWeft

  1. Open Meok Rail Freight Uk Mcp in the dashboard and add it to a workspace.
  2. Enable the server for the chats that should use its tools.

Desktop only via STDIO. STDIO servers start a local process, so they need the SourceWeft desktop host.

Other MCP clients

Follow the launch instructions in the repository.

README

[MCP Scorecard: 84/100]

meok-rail-freight-uk-mcp

UK rail freight compliance — ORR licensing, ROGS safety certificate, Railway Interoperability Regulations 2011, TSI LOC&PAS / WAG, RID dangerous goods, ORR 14 Major Issues inspection prep, Network Rail capacity access. By MEOK AI Labs.

Why this exists

UK rail freight's single biggest £ exposure is ORR enforcement (Office of Rail and Road) plus Network Rail capacity denial. ORR powers include:

  • Improvement notices + prohibition notices (ROGS 2006 / HSWA 1974)
  • Safety certificate + authorisation revocation
  • Unlimited fines (Health & Safety at Work Act 1974)
  • Director disqualification
  • Operating-without-licence is a criminal offence under Railways Act 1993

Target operators: Freightliner, GB Railfreight (GBRf), DB Cargo UK, Direct Rail Services (DRS), Colas Rail, Victa Westlink Rail, Mendip Rail, plus new Open-Access entrants. Network Rail is the upstream infrastructure manager. ORR is the regulator.

This MCP extends MEOK's haulage suite from road into rail. It gives Safety Managers, Verification engineers, RAIB liaison officers and capacity planners the callable toolkit to stay licensed and keep paths.

Install

bash
pip install meok-rail-freight-uk-mcp

Claude Desktop config

json
{  "mcpServers": {    "rail-freight-uk": {      "command": "meok-rail-freight-uk-mcp"    }  }}

Tools (7)

ToolUse case
check_orr_licence_complianceNetwork/Station/Operating licence held vs operations declared
check_railway_interoperability_directiveRIR 2011 conformity — NoBo + DeBo + AsBo CSM-RA
check_tsi_loc_pas_freightTSI LOC&PAS + TSI WAG subsystem evidence
check_rsl_safety_certificateROGS Reg 5 Part A + Part B Safety Certificate
check_dgsa_rail_class7_class1RID Class 7 (radioactive) + Class 1 (explosives)
prepare_orr_inspection_packEvidence pack against ORR's 14 Major Issues
check_network_rail_capacity_accessCapacity allocation + train path under Network Code Part D

Pricing

  • Free — MIT self-host
  • Starter — £149/mo
  • Pro — £399/mo (multi-operator)
  • Fleet — £1,999/mo (FOC-scale + capacity planner integration)

Rail = premium niche. Six operators carry ~95% of UK rail freight, each a multi-million-£ business with bet-the-company regulatory exposure. One avoided ORR enforcement notice + one preserved Network Rail timetable slot easily covers the year.

Regulatory basis

  • Railways Act 1993 — ORR licensing powers
  • Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS) — safety certificate, SMS
  • Railway Interoperability Regulations 2011 (RIR 2011) — TSI conformity (retained EU 2016/797)
  • TSI LOC&PAS — Locomotives & Passenger rolling stock
  • TSI WAG — Freight Wagons
  • TSI CCS — Control, Command & Signalling
  • COTIF / CIM — Convention concerning International Carriage by Rail
  • RID — Regulations concerning International Carriage of Dangerous Goods by Rail
  • CSM-RA (EU 402/2013 retained) — Common Safety Method on Risk Evaluation
  • Network Code Part D — Network Rail capacity allocation, Decision Criteria DC2.1–2.7

Sign your responses

bash
export MEOK_HMAC_SECRET="your-secret"meok-rail-freight-uk-mcp

License

MIT (c) 2026 Nicholas Templeman / MEOK AI Labs · haulage.app


Part of the MEOK constellation

This MCP is one node in a connected ecosystem built by MEOK AI LABS around a single sovereign AI core — governed agents with a hash-chained audit trail, mapped to the CSOAI compliance charter.

Source: README.md at commit fa7a2bd

Tools

0
SourceWeft has not started this package in its sandbox yet, so its tools are not known.

Version history

1
  1. v1.0.1LatestSep 16, 2026

Score

50% of the applicable checks met

How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.

  • Reached in the last 30 days25 pts

    Keep the endpoint answering the MCP handshake; SourceWeft probes it every 30 days.

  • Auth declared10 pts

    Declare the credential headers in the registry entry, or keep the endpoint answering the probe so its auth can be classified.

  • Tools listed15 pts

    Answer tools/list without a credential, or ship a package that starts in a sandbox without one.

  • DescriptionRequired15 pts
  • Logo10 pts
  • Documentation15 pts
  • License10 pts