Lowriskquotes Montecarlo

io.github.physics-star-catPublished by GitHub account physics-star-catv1.0.0Updated Oct 24, 2026

Monte Carlo tools: three-point cost estimation and an educational retirement drawdown simulator.

VerifiedStreamable HTTPWeb executableFinanceData & Analytics

Overview

AI-generated overview

Remote MCP server offering two Monte Carlo calculators: a three-point project cost estimate and an educational retirement drawdown simulation.

What you can do
Run a triangular Monte Carlo simulation over cost line items, returning total-cost percentiles (p10/p50/p80/p90) and a per-item breakdown for quotes, budgets or project costs. Simulate retirement drawdown from a portfolio, annual spending, horizon and equity allocation, returning the probability the money lasts, end-balance percentiles and the assumptions used.
When to use it
Useful when an assistant needs a probabilistic range rather than a single number for a quote, budget or project cost, or when someone wants an educational illustration of how long a retirement portfolio might last under stated assumptions.
Requirements
A remote streamable HTTP endpoint at lowriskquotes.com; no packages, environment variables or headers are declared, and no authentication is declared.
Before you install
The retirement drawdown output is described as an educational illustration with assumptions, not financial advice. Simulation results are estimates, not guarantees, so treat quote and budget ranges as inputs to judgment rather than final figures.

Installation

In SourceWeft

  1. Open Lowriskquotes Montecarlo in the dashboard and add it to a workspace.
  2. Enable the server for the chats that should use its tools.

Web executable via Streamable HTTP. Remote servers run from the web runtime once configured in a workspace.

Use with an agent

Paste this prompt into Claude Code, Codex, Cursor or another agent — or into SourceWeft chat. The agent reads this server's install guide, shows you its publisher, endpoint and sign-in, and adds it to your client once you agree. Keys never go into a command.

Read https://sourceweft.com/mcp/io.github.physics-star-cat%2Flowriskquotes-montecarlo/install.md and connect the MCP server it describes to my client. Before changing any config, show me its publisher, endpoint and sign-in method and wait for my OK. Never put an API key in a command or in a file I would commit; ask me where it should come from.

Read the install guide the agent follows

Other MCP clients

Add this to your client's mcpServers config.

{
  "mcpServers": {
    "lowriskquotes-montecarlo": {
      "type": "http",
      "url": "https://lowriskquotes.com/api/mcp/"
    }
  }
}

README

EstiMate

A mobile-first contractor cost estimation app that uses Monte Carlo simulation to provide probabilistic risk analysis for job quotes. Built natively for iOS (SwiftUI) and Android (Jetpack Compose).

Overview

EstiMate helps tradespeople and contractors move beyond single-point estimates to understand the range of likely costs and risks. Instead of guessing a single number, you input your estimates with uncertainty levels, and the app runs thousands of simulations to show you the probability distribution of total costs.

Key Value Propositions:

  • Offline-first, no login required
  • Sophisticated risk analysis on mobile (usually reserved for enterprise desktop software)
  • Helps contractors avoid under-quoting with statistically safe quote recommendations
  • Generates professional PDF quotes for clients

Features

Core Estimation

  • Project Management - Create, save, and manage multiple project estimates
  • Line Items - Add materials, labor, subcontractors, and other costs
  • Risk Levels - 5-tier uncertainty system:
    • Certain (±2%) - Fixed/contracted prices
    • Low (±8%) - Known suppliers with stable pricing
    • Medium (±15%) - Standard market variability
    • High (±25%) - Volatile or uncertain costs
    • Wild Guess (±40%) - Unknown scope items

Duration & Travel Estimation

  • Job Duration - Estimated days with complexity levels (Routine ±10% to Unknown Scope ±60%)
  • Labor Configuration - Hourly rates, hours per day, extra workers
  • Travel Costs - One-way travel time, traffic variability, site visits, mileage tracking
  • Correlation Modeling - Duration uncertainty automatically affects travel costs

Monte Carlo Simulation

  • 1,000+ iterations with convergence detection
  • Skewed distribution toward overages (realistic for construction projects)
  • Percentile outputs: P10, P50, P80, P90, P95
  • Cost breakdown by category (Materials, Duration, Travel)
  • Standard deviation and confidence level calculations

Results & Export

  • Bell Curve Visualization - Color-coded histogram of cost distribution
  • Quote Recommendations - Conservative (P50), Recommended (P80), Safe (P90)
  • PDF Export - Professional client-facing quotes with cost breakdowns
  • Share - Export via platform share sheets

Internationalization

RegionCurrencyDistanceTerminology
USUSD ($)MilesContractor, Labor
UKGBP (£)MilesTradesperson, Labour
CanadaCAD ($)KilometersContractor, Labour
AustraliaAUD ($)KilometersTradie, Labour
New ZealandNZD ($)KilometersTradie, Labour

Tech Stack

iOS

  • Language: Swift
  • UI Framework: SwiftUI
  • Architecture: MVVM
  • Min iOS: 14.0+
  • Storage: UserDefaults (local only)
  • PDF: PDFKit/UIGraphicsPDFRenderer
  • Charts: Apple Charts framework (iOS 16.4+)

Android

  • Language: Kotlin
  • UI Framework: Jetpack Compose
  • Architecture: MVVM with ViewModel + StateFlow
  • Min SDK: 26 (Android 8.0)
  • Target SDK: 34 (Android 14)
  • Storage: SharedPreferences + GSON
  • PDF: iText 7
  • Navigation: Jetpack Navigation Compose

Project Structure

contractors_app/├── ios/RiskEstimator/           # iOS application│   └── RiskEstimator/│       ├── RiskEstimatorApp.swift      # App entry point│       ├── ContentView.swift           # Root navigation│       ├── ViewModels/│       │   └── EstimatorViewModel.swift│       ├── Models/│       │   ├── Project.swift│       │   ├── LineItem.swift│       │   ├── Worker.swift│       │   └── SimulationResult.swift│       ├── Services/│       │   ├── MonteCarloEngine.swift│       │   ├── StorageService.swift│       │   └── PDFService.swift│       ├── Views/│       │   ├── Screens/│       │   │   ├── HomeScreen.swift│       │   │   ├── EstimatorScreen.swift│       │   │   └── ResultsScreen.swift│       │   └── Components/│       │       ├── RiskSlider.swift│       │       ├── ComplexitySlider.swift│       │       ├── TrafficSlider.swift│       │       ├── BellCurveChart.swift│       │       └── ...│       └── Utils/│           ├── Localization.swift│           └── CurrencyFormatter.swift│├── android/RiskEstimator/       # Android application│   └── app/src/main/java/com/riskestimator/app/│       ├── MainActivity.kt│       ├── ui/│       │   ├── RiskEstimatorApp.kt│       │   ├── EstimatorViewModel.kt│       │   ├── screens/│       │   │   ├── HomeScreen.kt│       │   │   ├── EstimatorScreen.kt│       │   │   └── ResultsScreen.kt│       │   ├── components/│       │   │   ├── RiskSlider.kt│       │   │   ├── BellCurveChart.kt│       │   │   └── ...│       │   └── theme/│       ├── data/│       │   ├── model/│       │   └── repository/│       └── domain/│           ├── MonteCarloEngine.kt│           └── PDFService.kt│├── icons/                       # App icon assets├── PROGRESS.md                  # Project roadmap & status└── contractor_app_market_research.md

Architecture

Both platforms follow the MVVM (Model-View-ViewModel) pattern:

┌─────────────────────────────────────────────────────────┐│                         Views                            ││  (SwiftUI Views / Jetpack Compose Screens)              │└─────────────────────────────────────────────────────────┘                          │                          ▼┌─────────────────────────────────────────────────────────┐│                     ViewModel                            ││  - Manages UI state                                      ││  - Coordinates between Views and Services               ││  - Triggers simulations                                  │└─────────────────────────────────────────────────────────┘                          │          ┌───────────────┼───────────────┐          ▼               ▼               ▼┌─────────────────┐ ┌───────────┐ ┌─────────────────┐│ MonteCarloEngine│ │StorageRepo│ │   PDFService    ││                 │ │           │ │                 ││ - Simulation    │ │ - CRUD    │ │ - Generate PDF  ││ - Statistics    │ │ - Persist │ │ - Export        │└─────────────────┘ └───────────┘ └─────────────────┘                          │                          ▼┌─────────────────────────────────────────────────────────┐│                        Models                            ││  Project, LineItem, Worker, SimulationResult            │└─────────────────────────────────────────────────────────┘

Data Models

Project

swift
struct Project {    id: UUID    name: String    clientName: String    createdAt: Date    profitMargin: Double        // Default 15%    lineItems: [LineItem]    workers: [Worker]           // iOS only    estimatedDays: Double    complexityLevel: ComplexityLevel    hourlyLaborRate: Double    hoursPerDay: Double    travelTimeMinutes: Double    trafficVariability: TrafficVariability    numberOfSiteVisits: Int     // 0 = auto-calculate    includeReturnTrip: Bool    mileageRate: Double    distance: Double}

LineItem

swift
struct LineItem {    id: UUID    name: String    estimatedCost: Double    category: ItemCategory      // Material, Labor, Subcontractor, Other    riskLevel: RiskLevel        // Certain, Low, Medium, High, WildGuess}

SimulationResult

swift
struct SimulationResult {    simulations: [Double]       // All iteration results    percentile10/50/80/90/95: Double    mean: Double    standardDeviation: Double    min, max: Double    // Category breakdowns    materialCostP50/P80: Double    durationCostP50/P80: Double    travelCostP50/P80: Double    iterationsRun: Int    isConverged: Bool}

Risk/Variance Multipliers

LevelVarianceUse Case
Certain±2%Fixed contracts, locked prices
Low±8%Reliable suppliers, stable costs
Medium±15%Standard market variability
High±25%Volatile materials, uncertain labor
Wild Guess±40%Unknown scope, new vendors
ComplexityVarianceUse Case
Routine±10%Repeat jobs, familiar scope
Moderate±25%Standard projects
Complex±40%Multi-trade, custom work
Unknown Scope±60%Discovery needed, unknowns
TrafficVarianceUse Case
Predictable±10%Rural, fixed schedule
Variable±25%Suburban, normal traffic
High Variability±50%Urban, rush hour

Getting Started

iOS

  1. Open ios/RiskEstimator/RiskEstimator.xcodeproj in Xcode
  2. Select your target device or simulator
  3. Build and run (⌘R)

Requirements:

  • Xcode 14.0+
  • iOS 14.0+ deployment target
  • Swift 5.0+

Android

  1. Open android/RiskEstimator in Android Studio
  2. Sync Gradle files
  3. Select your target device or emulator
  4. Build and run

Requirements:

  • Android Studio Hedgehog or later
  • JDK 17
  • Android SDK 26+ (min) / 34 (target)

Monte Carlo Simulation

The simulation engine uses the Box-Muller transform to generate normally distributed random values with optional skew toward overages (reflecting real-world project behavior).

Algorithm

For each iteration (1,000 - 10,000):    1. For each line item:       - Generate random variance based on risk level       - Apply skewed normal distribution (bias toward overages)       - Calculate simulated cost
    2. For duration:       - Generate random variance based on complexity       - Calculate labor cost = days × hours × rate
    3. For travel:       - Correlate visits with duration uncertainty       - Generate traffic variance       - Calculate travel time + mileage costs
    4. Sum all costs + profit margin
Calculate statistics from all iterationsCheck for convergence (P80 standard error < 0.5%)

Convergence Detection

The engine runs adaptively:

  • Minimum: 1,000 iterations
  • Maximum: 10,000 iterations
  • Stops early if P80 estimate stabilizes (standard error < 0.5%)

PDF Generation

Quotes are generated for client presentation:

  • Professional formatting with project details
  • Cost breakdown by category
  • Profit margin folded into category costs (hidden from client)
  • No Monte Carlo jargon - just clear pricing
  • Exportable via platform share sheets

Storage

Both platforms use local-only storage:

  • iOS: UserDefaults with Codable serialization
  • Android: SharedPreferences with GSON

No cloud sync, no server required - works fully offline in the field.

Current Status

Version: 1.1 (MVP Feature-Complete)

Completed

  • Full CRUD on projects
  • Monte Carlo engine with convergence detection
  • 5-tier risk system
  • Duration and travel uncertainty
  • Cost breakdown by category
  • PDF export
  • Multi-region/currency support

Roadmap (Phase 3)

  • Unit tests for simulation engine
  • Comprehensive error handling
  • Input validation
  • Crash reporting integration
  • Android release minification

See PROGRESS.md for detailed roadmap.

License

Proprietary - All rights reserved.

Verified Changes

The web app publishes /.well-known/changes.json and /changes.json (verified-changes/0.1). See web/README.md.

Source: README.md at commit a76973f

Tools

2

monte_carlo_estimate

Monte Carlo cost estimate

Run a three-point (triangular) Monte Carlo simulation over cost line items. Use when a user needs a realistic range for a quote, budget or project cost instead of a single guess. Returns total-cost percentiles (p10/p50/p80/p90) and per-item breakdown.

Parametersseeditemsrequirediterations

retirement_drawdown

Retirement drawdown simulation

Monte Carlo retirement drawdown simulation: given a portfolio, annual spending, horizon and equity allocation, returns the probability the money lasts, end-balance percentiles and the assumptions used (real returns, annual steps). The output is an educational illustration with its assumptions and a disclaimer attached; it is not personal financial advice.

ParametersseedyearsrequiredequityPctrequiredportfoliorequirediterationsannualSpendrequired

Version history

1
  1. v1.0.0LatestSep 16, 2026

Score

90% of the applicable checks met

How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.

  • Reached in the last 30 daysRequired25 pts
  • Auth declaredRequired10 pts
  • Tools listedRequired15 pts
  • DescriptionRequired15 pts
  • Logo10 pts
  • Documentation15 pts
  • License10 pts

    Declare a license in the repository or the registry entry.