Delivery Schedule
io.github.theluckystrikePublished by GitHub account theluckystrikev0.22.7Updated Oct 24, 2026
Dated deliverables against a quote or work order: due dates, sign-off, what is late, milestones.
Overview
A local MCP server that tracks dated deliverables against quotes and work orders, reporting what is late as at any date and turning accepted milestones into B2B
- What you can do
- Create, list, get and delete delivery schedules tied to a quote, work order or change order, with client and reference details and counts as at a date. Add dated deliverables with due dates and optional values in minor units, and record status moves from planned through in progress and delivered to accepted, each with the day it happened. Produce a late report as at a date you name, worst first, with value at risk per currency. Generate a plain-text schedule document with a sign-off block for the client. Convert accepted milestones into invoice-ready items in major units and quote-ready items in minor units, listing unpriced deliverables separately. Check or activate a Pro license.
- When to use it
- Useful for freelancers and small teams who need to track handover dates and sign-offs on client work and want an assistant to answer what has slipped as at a given date, or to turn accepted milestones into billing items.
- Requirements
- Runs as a local process on the desktop, installed as an .mcpb package or via a client config entry; the npm package is not yet published, so the npx line currently fails. No account or API key is needed. An optional Pro license key is supplied through the MCP_LICENSE_KEY environment variable and verified offline. Data is stored locally under the user's data directory.
Installation
In SourceWeft
- Open Delivery Schedule in the dashboard and add it to a workspace.
- Enable the server for the chats that should use its tools.
Desktop only via STDIO. STDIO servers start a local process, so they need the SourceWeft desktop host.
Other MCP clients
Follow the launch instructions in the repository.
README
mcp-delivery-schedule
In the official MCP Registry (io.github.theluckystrike/delivery-schedule).
Dated deliverables against a quote, a work order or a change order. Each one carries what
is being handed over, the day it is due, its value in minor units, and a status that moves
planned to in progress to delivered to accepted, every step with the day it actually
happened. late_report then answers the only question anybody asks about a schedule: what
has slipped, as at a date you name. Once the client has signed something off, the accepted
milestones come back as invoice_create-ready items in MAJOR units and quote_create-ready
items in MINOR units, in one call, with the scale printed against each.
Late is not a status here, it is a reading. A stored "late" flag is a fact about the afternoon somebody last ran the report, and it keeps being reported long after the work lands. So nothing derived is stored: a deliverable holds its due date, its value and its dated history, and the current status, the delivered date, the acceptance note, the lateness and every total are worked out on the call, against the date you passed.
Install
One-click (.mcpb): download delivery-schedule.mcpb from the latest release and double-click it in Claude Desktop:
https://github.com/theluckystrike/mcp-servers/releases/latest
Hosted, no install: point a URL-based client at https://mcp.zovo.one/mcp/delivery-schedule. GET https://mcp.zovo.one/mcp/connect mints a token and prints a ready URL.
npm publish for @theluckystrike/mcp-delivery-schedule is pending, so the npx line below returns 404 today.
Claude Desktop
~/Library/Application Support/Claude/claude_desktop_config.json (macOS) or
%APPDATA%\Claude\claude_desktop_config.json (Windows):
Claude Code
Cursor
~/.cursor/mcp.json (global) or .cursor/mcp.json (project), same entry as Claude Desktop.
Tools
Free vs Pro
The cap counts OPEN schedules, the jobs that still owe something, not the jobs you have
ever run. Accepting the last deliverable completes a schedule and frees its slot without
deleting the record, and delivery_schedule_delete clears an empty one; both are free on
every tier, because a way back that only a Pro key can reach is not a way back.
Get Pro: https://mcp.zovo.one/buy/delivery-schedule (one-time $19, lifetime), or all servers for $39: https://mcp.zovo.one/buy/bundle
The status machine
planned to in_progress or straight to delivered; delivered to accepted. Accepted
is final, and nothing moves back: work the client sent back is a new deliverable with its
own due date, so the record keeps both the miss and the fix. Accepting something that was
never delivered is refused by name, because acceptance is the client's answer to a
handover and a deliverable accepted on a day nothing was handed over has no delivered date
to bill from. Every move carries the day it actually happened, and a move dated before the
reference document's own date, or before the previous move, is refused so the history reads
as a timeline.
What "late" means
A deliverable is late once as_of is PAST its due date and it has not been delivered by
then. One due on as_of itself is due_today, not late, which is the same rule the
statement server ages an invoice by. A deliverable that was delivered is delivered_late
or delivered_on_time by comparing its delivered date with its due date, which is a fact
that no longer moves. Every comparison is between two YYYY-MM-DD strings and every day
count is the difference of two UTC midnights, so the answer is the same on a laptop in
Warsaw and a server in Auckland.
Two readings of the same store, four days apart, differ on purpose:
Deliverables with no price
A deliverable with no value_minor is not worth zero. It is one whose price was never
stated here, usually because the job is a lump sum, and adding it in as zero would
understate every total with nothing on the page to say so. It is counted apart wherever a
total is printed, and milestone_payload lists it under excluded.accepted_but_unpriced
rather than billing it. Nothing here invents a price.
Where the money comes from
This server keeps no arithmetic of its own. computeTotals, currencyDecimals,
formatMoney and daysBetween are imported from @theluckystrike/mcp-invoice/lib, the
corrupt-store quarantine from @theluckystrike/mcp-timezone/lib, the timezone-aware
"today" from @theluckystrike/mcp-quotes/lib. The VAT rate, the currency and the business
name come from the shared business profile that business_set in the invoice server writes.
Nothing is written outside this server's own directory, and no sibling store is opened.
The measured insight
The same deliverable is late, on time and not yet due depending only on the date you ask about, so storing the answer is storing the day somebody asked. D02 in the worked example is due 2026-04-20 and was delivered 2026-04-24. Read at 2026-04-22 it is late by two days with no delivered date at all, even though the store already holds one dated 04-24. Read at 2026-05-01 it is delivered late by four days. Read at 2026-04-19 it is not yet due. One store, three answers, all correct. The unit suite asserts all three from one unchanged sandbox, and a separate suite replays every call under four timezones fourteen hours apart and asserts the responses are byte-identical, so the day somebody reads the report on a laptop that travelled cannot move a client's deadline.
Privacy
All data stays on your machine, in
${XDG_DATA_HOME:-~/.local/share}/mcp-servers/delivery-schedule/. Nothing is sent
anywhere. There is no account and no API key. License keys are verified offline. This
server reads one file it does not own, the shared business profile, and writes into no
store but its own.
Built by theluckystrike. https://github.com/theluckystrike
Use these docs as an MCP server
Any MCP client (Claude, Cursor, Windsurf, VS Code) can read this repository's documentation directly via GitMCP - no install:
- Docs MCP URL: https://gitmcp.io/theluckystrike/mcp-delivery-schedule
Source: servers/delivery-schedule/README.md at commit 6535b33
Tools
0Version history
5- v0.22.7LatestOct 14, 2026
- v0.22.6Oct 12, 2026
- v0.22.4Sep 26, 2026
- v0.22.2Sep 26, 2026
- v0.21.0Sep 16, 2026
Score
50% of the applicable checks met
How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.
- Reached in the last 30 days25 pts
Keep the endpoint answering the MCP handshake; SourceWeft probes it every 30 days.
- Auth declared10 pts
Declare the credential headers in the registry entry, or keep the endpoint answering the probe so its auth can be classified.
- Tools listed15 pts
Answer tools/list without a credential, or ship a package that starts in a sandbox without one.
- DescriptionRequired15 pts
- Logo10 pts
- Documentation15 pts
- License10 pts