Zovo Project Timeline

io.github.theluckystrikePublished by GitHub account theluckystrikev1.0.0Updated Oct 26, 2026

A Gantt chart maker and project timeline planner that works inside the chat.

VerifiedStreamable HTTPWeb executableProductivity & WorkflowData & Analytics

Overview

AI-generated overview

Remote MCP server that turns a task list into a Gantt-style project timeline with milestones, critical path and what-if scenario comparisons.

What you can do
  • Build a project timeline from a task list: Gantt chart, schedule, milestones, early/late start and finish, total and free float, critical path and project duration.
  • Compare schedule scenarios: model 1 to 4 changes such as a task slipping, taking longer or shorter, or starting later, and see the new finish date and whether the critical path changes.
When to use it
Useful when someone wants a project schedule or Gantt chart generated from a list of tasks, needs critical path method figures, or asks what happens to the finish date if a task slips or changes duration.
Requirements
Remote streamable HTTP endpoint; no packages, environment variables, headers or authentication are declared, so no local runtime or credentials are needed.
Before you install
The server computes schedules only; it does not appear to store or edit project data. Task lists and scenario details are sent to a third-party hosted endpoint, so avoid including confidential project information unless that is acceptable.

Installation

In SourceWeft

  1. Open Zovo Project Timeline in the dashboard and add it to a workspace.
  2. Enable the server for the chats that should use its tools.

Web executable via Streamable HTTP. Remote servers run from the web runtime once configured in a workspace.

Use with an agent

Paste this prompt into Claude Code, Codex, Cursor or another agent — or into SourceWeft chat. The agent reads this server's install guide, shows you its publisher, endpoint and sign-in, and adds it to your client once you agree. Keys never go into a command.

Read https://sourceweft.com/mcp/io.github.theluckystrike%2Fgantt-timeline/install.md and connect the MCP server it describes to my client. Before changing any config, show me its publisher, endpoint and sign-in method and wait for my OK. Never put an API key in a command or in a file I would commit; ask me where it should come from.

Read the install guide the agent follows

Other MCP clients

Add this to your client's mcpServers config.

{
  "mcpServers": {
    "zovo-project-timeline": {
      "type": "http",
      "url": "https://gantt-timeline.zovo.one/mcp"
    }
  }
}

Tools

2

plan_project_timeline

Plan project timeline

Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.

Parameterstasksrequiredcountrycalendarstart_datesubdivisionproject_nameduration_unitnon_working_dates

compare_timeline_scenarios

Compare timeline what-ifs

Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).

Parameterstasksrequiredcountrycalendarscenariosrequiredstart_datesubdivisionproject_nameduration_unitnon_working_dates

Version history

1
  1. v1.0.0LatestOct 22, 2026

Score

83% of the applicable checks met

How complete this listing is, computed from the registry entry, the endpoint and public sources. Not a rating of the server and not a statement that it is safe or working today: reachability is a dated check, and no installs or reviews go into the score.

  • Reached in the last 30 daysRequired25 pts
  • Auth declaredRequired10 pts
  • Tools listedRequired15 pts
  • DescriptionRequired15 pts
  • Logo10 pts
  • Documentation15 pts

    Declare a GitHub repository with a README, or serve resource_documentation in the OAuth protected-resource metadata.

  • LicenseNot applicable

    A hosted service is used under its provider's terms, so no license is expected here. This check is left out of the percentage.