Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
Parameterscooling_kwrequiredit_load_kwrequiredlighting_kwrequiredups_losses_kwrequired
Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.
Parameterssectorrequiredhas_cisorequiredhas_ir_planrequiredhas_ot_policyrequiredhas_24h_reportingrequiredhas_ot_monitoringrequiredorganisation_sizerequiredhas_asset_inventoryrequiredhas_board_reportingrequiredhas_supplier_assessmentrequiredhas_network_segmentationrequired
Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.
Parameterscountryrequiredyear_builtrequiredcurrent_epcrequiredhas_solar_pvrequiredbuilding_typerequiredfloor_area_m2requiredheating_systemrequired
Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.
Parametersit_load_kwrequiredredundancyrequiredspace_typerequiredclimate_zonerequiredfloor_area_m2requiredoccupancy_personsrequired
Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.
Parametersemiraterequiredhas_beprequiredifc_exportrequiredbim_softwarerequiredbuilding_typerequiredhas_bim_modelrequiredbuilding_floorsrequiredbuilding_area_m2required
Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.
Parametersemiraterequiredhas_ismsrequiredis_cloud_hostedrequiredorganisation_typerequiredhas_incident_responserequiredhas_third_party_auditrequiredhas_data_classificationrequiredhas_vulnerability_assessmentrequired
check_grid_feasibility_uae
Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.
Parametersintended_userequiredsite_locationrequiredvoltage_levelrequiredhas_existing_supplyrequiredpower_requirement_mwrequiredtarget_completion_yearrequired
Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.
Parametersgeographyrequireddisciplinesrequiredbuilding_typerequiredgross_area_m2requiredtimeline_weeksrequiredtransaction_typerequired
Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.
Parameterscountryrequiredbuilding_typerequiredfloor_area_m2requiredenergy_kwh_yearconstruction_year
Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.
Parametersit_load_kwrequiredredundancyrequiredlighting_kwcooling_typerequiredroom_area_m2requiredambient_temp_crequiredups_efficiency_pctrequired
Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.
Parametersteam_sizerequiredhourly_raterequiredmanual_hoursrequiredsoftware_costefficiency_gain_pctrequiredimplementation_time_monthsrequired
Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.
Parametersbimrequiredfloorsrequiredlocationrequiredconditionrequiredstructurerequiredyear_builtrequiredcurrent_userequiredproposed_userequired
Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.
Parametersgradeconfigrequiredspan_mrequiredexposurematerialrequiredudl_kn_mrequiredfire_ratingload_positionpoint_load_kn
Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.
Parameterssectiondepth_mmmaterialrequiredwidth_mmaxial_load_knrequiredbuckling_curveeccentricity_mmreinforcement_pcteffective_length_mrequired
Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices.
Parametersbimcountryrequiredprogrammeprocurementproject_typerequiredfloor_area_m2requiredspecification
DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.
Parametersanswersrequiredcert_target
NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report.
Parametersanswersrequiredpurpose
digital_renovation_passport
EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.
Parameterseraaddresscountryheatingrequiredcurrent_epcrequiredbuilding_typefloor_area_m2required
UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA.
Parameterslistedlocationproposalrequiredarticle_4use_classproposed_useproperty_typerequiredconservation_areaextension_depth_mnational_park_aonb
UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative.
Parametersworksrequireddwellingsbuilding_typerequiredparking_spacesrequiredcovered_car_park
UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative.
Parametersfloor_area_m2requiredlocation_riskrequiredglazing_area_m2requiredcross_ventilationmost_glazed_facaderequiredprovided_free_area_m2
England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties.
Parametersproperty_typerequiredcurrent_epc_bandrequired
Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured.
Parametersstoreysage_bandrequiredlocationrequiredflow_temp_cfloor_area_m2requiredair_change_rateceiling_height_mglazing_pct_of_floorexternal_design_temp_cinternal_design_temp_c
EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values.
Parametersit_power_kwrequiredit_energy_kwhrequiredwater_input_m3reused_heat_kwhtotal_energy_kwhrequiredrenewable_energy_kwh
UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats.
Parametersgas_m3emiraterequiredgas_kwhelectricity_kwhrequired
UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.
Parameterssap_ratingfloor_area_m2annual_energy_kwh