RemedyBridge free tools for tenants

uk.co.remedybridge由 remedybridge.co.uk 发布官方发布者v1.0.0更新于 Oct 30, 2026

Free tools for UK tenants: Awaab's Law and complaint deadlines, repair letters, housing help search

已验证Streamable HTTP可网页运行位置与生活知识与记忆

概览

AI 生成的概览

RemedyBridge 提供的免费只读工具,帮助英格兰和威尔士的租户查询住房维修规则、计算法定期限并起草信件。

可以做什么
  • 检索已发布的指南,涵盖房东维修义务、潮湿与霉变、Awaab 法、投诉及诉前程序
  • 按工作日计算 Awaab 法、住房监察专员投诉和诉前程序的期限
  • 获取首次报修、催办和正式投诉的信件模板,内含待填写的方括号空缺
  • 针对具体问题和房东类型生成失修证据清单
适用场景
适用于英格兰或威尔士的租户咨询维修、潮湿霉变或失修问题,需要了解房东或市政机构应在何时答复,或希望获得可直接使用的信件和证据清单时。
运行要求
位于 remedybridge.co.uk 的远程 streamable HTTP 端点;未声明身份验证、环境变量或请求头。需要网络访问。
安装前请注意
回答仅为规则的一般信息,不构成法律建议,服务器声明不会说明任何人享有哪些权利。信件模板含由租户自行填写的方括号空缺,服务器声明不收集其个人信息。依赖期限前请对照官方来源核实。

安装

在 SourceWeft 中

  1. 打开 控制台中的 RemedyBridge free tools for tenants,将其添加到工作区。
  2. 为需要使用其工具的对话启用该服务。

Web executable,通过 Streamable HTTP。 远程服务在工作区中配置后即可从网页运行时运行。

交给智能体安装

把这段提示词粘贴到 Claude Code、Codex、Cursor 等智能体,或 SourceWeft 对话中。智能体会读取该服务器的安装指南,先向你展示发布者、端点和登录方式,经你同意后再把它添加到你的客户端。密钥不会写进任何命令。

阅读 https://sourceweft.com/mcp/uk.co.remedybridge%2Fhousing-repair-tools/install.md,并按其中说明把这个 MCP 服务器接入我的客户端。修改任何配置之前,先告诉我它的发布者、端点和登录方式,等我确认。不要把 API 密钥写进命令或我会提交的文件;问我密钥应从哪里获取。

查看智能体所依据的安装指南

其他 MCP 客户端

把它添加到你客户端的 mcpServers 配置中。

{
  "mcpServers": {
    "remedybridge-free-tools-for-tenants": {
      "type": "http",
      "url": "https://remedybridge.co.uk/mcp/"
    }
  }
}

工具

6

search_housing_repair_help

Housing repair help and glossary

Answers tenants’ questions about repairs, damp and mould and disrepair in rented homes in England and Wales, from RemedyBridge’s published guides: what a landlord must repair and how quickly, Awaab’s Law, section 11 of the Landlord and Tenant Act 1985 and fitness for human habitation, reporting repairs, landlord complaints and the Housing Ombudsman, free helplines and who each one is for, Environmental Health and HHSRS, withholding rent, eviction after a complaint, the pre-action protocol and evidence. It searches the quick answer and the questions and answers of every guide, and a glossary of 54 housing terms, and returns each answer with the link to its page. Use it for "what is", "who is responsible", "how long" and "what can I do" questions. It does not assess anyone’s situation.

输入参数query必填

check_awaabs_law_deadlines

Awaab’s Law deadline checker

Works out the dates Awaab’s Law gives a council or housing association in England (the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025, SI 2025/1042) to deal with damp or mould: investigate it, give the tenant a written summary, finish any safety work and start any further work. It counts working days from the day after the landlord found out, leaving out weekends and bank holidays in England and Wales, and says whether each date has passed. For an emergency hazard it gives the 24-hour rule; for other hazards it gives the position on Awaab’s Law Phase 2 from the site’s legal register. It says when Awaab’s Law does not apply (private landlords, Wales, shared ownership and long leases). It does not decide whether a hazard is significant, and a missed date is a dated failure, not an entitlement to anything.

输入参数asAthazardawareOnlandlord必填investigatedOn

calculate_landlord_complaint_deadlines

Landlord complaint deadline calculator

Works out when a council or housing association in England must acknowledge and answer a tenant’s complaint under the Housing Ombudsman’s Complaint Handling Code (2024): at stage 1, acknowledge within 5 working days and respond within 10 working days of acknowledging (paras 6.2 to 6.4); at stage 2, acknowledge within 5 and respond within 20 (paras 6.11 to 6.15), each with the longest extension. It counts working days, leaving out weekends and bank holidays in England and Wales; a complaint received at a weekend or on a bank holiday counts from the next working day. Give the dates the landlord acknowledged or answered, if it has, to see whether each was on time. It says when the Code does not usually apply (private landlords, Wales). It never says what a complaint will achieve.

输入参数asAtstagelandlord必填receivedOnrespondedOnacknowledgedOn

calculate_pre_action_protocol_timetable

Pre-action protocol timetable

Works out the timetable the Pre-Action Protocol for Housing Conditions Claims (England) sets after a tenant’s letter of claim: the letter is treated as received two days after its date, the landlord should reply within 20 working days of that (paras 6.2 and 7.2(a)), the inspection should follow within 20 working days of the reply (para 7.4(a)), the expert’s report or agreed schedule within 10 working days of the inspection (para 7.4(b) and (d)), and the landlord’s full response within 20 working days of receiving it (para 6.3). Give the later dates as they happen to see each next date and whether each step was on time. It counts working days, leaving out weekends and bank holidays in England and Wales. The protocol calls these long stops, and they can be changed by agreement (para 9). Wales has its own protocol, with the same periods for the reply, the inspection and the report.

输入参数asAtreplyDateletterDate必填inspectionDatereportReceivedDate

get_repair_letter_template

Repair letter templates

Gives the text of a letter for a tenant to send their landlord, with [bracketed] gaps to fill in: "first-report" to report a repair in writing for the first time, "chaser" when it was reported and nothing has happened, "complaint" to make a formal complaint under the landlord’s complaints procedure (citing section 11 of the Landlord and Tenant Act 1985 in England, or sections 91 and 92 of the Renting Homes (Wales) Act 2016 in Wales), or "awaabs-law" to ask a council or housing association in England to deal with a hazard under Awaab’s Law. The Awaab’s Law letter is given only to a tenant of a council or housing association in England with a tenancy (not a licence, shared ownership or a long lease). It never takes the tenant’s name, address or details: fill in the gaps with them. The letters state facts and make a request; they promise no outcome.

输入参数tenurecountrylandlordtemplate必填

build_evidence_checklist

Evidence checklist builder

Lists the evidence worth gathering about disrepair in a rented home, for the problems and the landlord given: what everyone should keep (dated photos, copies of every report, reference numbers, appointments and complaint letters), then what each problem needs and what each kind of landlord’s case needs. Problems: "damp" (damp or mould), "leak" (leaks or water ingress), "heating" (heating or boiler), "electrics" (unsafe electrics), "windows" (windows or doors), "pests" (pests or vermin), "structural" (structural or plaster). It asks for no personal details.

输入参数landlordproblems

版本历史

1
  1. v1.0.0最新Oct 30, 2026

评分

已满足适用检查项的 83%

该评分衡量此收录条目的完整程度,依据注册中心条目、端点与公开来源计算得出。它不是对服务器本身的评价,也不表示服务器安全或当前可用:可连通性是带日期的检查结果,评分也不包含安装量或用户评价。

  • 近 30 天内可连通必需25 分
  • 已声明认证方式必需10 分
  • 已列出工具必需15 分
  • 描述必需15 分
  • 图标10 分
  • 文档15 分

    请声明包含 README 的 GitHub 仓库,或在 OAuth 受保护资源元数据中提供 resource_documentation。

  • 许可证不适用

    托管服务按其提供方的条款使用,因此这里不要求许可证。此检查项不计入百分比。