McpStamp Change Orders

io.github.theluckystrike由 GitHub 帳號 theluckystrike 發布v0.23.0更新於 Nov 3, 2026

針對報價和工單的變更單:行專案變更、核准、合同動態價值。

AI 翻譯由 AI 模型根據下方的原文描述翻譯,可能有誤。

原文描述

Change orders against quotes and work orders: line changes, approval, running contract value.

已驗證Streamable HTTP可網頁執行效率與工作流金融商業與電商

概覽

McpStamp Change Orders 的託管 MCP 服務(mcp.zovo.one);無需登入;Streamable HTTP;11 個工具。

暫無 AI 概覽:以下資訊來自註冊中心條目和服務本身。

端點
mcp.zovo.one
最近檢查

安裝

在 SourceWeft 中

  1. 開啟 儀表板中的 McpStamp Change Orders,將其新增到工作區。
  2. 為需要使用其工具的對話啟用該服務。

Web executable,透過 Streamable HTTP。 遠端服務在工作區中設定後即可從網頁執行環境執行。

交給代理程式安裝

把這段提示詞貼上到 Claude Code、Codex、Cursor 等代理程式,或 SourceWeft 對話中。代理程式會讀取該伺服器的安裝指南,先向你展示發布者、端點和登入方式,經你同意後再把它新增到你的客戶端。金鑰不會寫進任何命令。

閱讀 https://sourceweft.com/mcp/io.github.theluckystrike%2Fchange-order/install.md,並按其中說明把這個 MCP 伺服器接入我的客戶端。修改任何設定之前,先告訴我它的發布者、端點和登入方式,等我確認。不要把 API 金鑰寫進命令或我會提交的檔案;問我金鑰應從哪裡取得。

檢視代理程式所依據的安裝指南

其他 MCP 客戶端

把它新增到你客戶端的 mcpServers 設定中。

{
  "mcpServers": {
    "mcpstamp-change-orders": {
      "type": "http",
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}

README

mcp-change-order

In the official MCP Registry (io.github.theluckystrike/change-order). Change orders against a quote or a work order, kept the way a variation is kept on site: what was added, what was taken out and what changed, each with a reason and a date, sent to the client, and answered. The running contract value is the original plus the deltas the client has APPROVED; what they have not answered yet is shown as pending and never added in. Once a change order is approved, the delta comes back as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, in one call, with the scale printed against each.

No delta is stored. A change order holds its lines and its status history; the delta, the running value and the VAT are derived on every call, with the invoice server's own arithmetic. Nothing is invented: the first change order against a reference states the original contract value once, every later one inherits it, and a different figure is refused by name.

Install

One-click (.mcpb): download change-order.mcpb from the latest release and double-click it in Claude Desktop: https://github.com/theluckystrike/mcp-servers/releases/latest

Hosted, no install: point a URL-based client at https://mcp.zovo.one/mcp/change-order. GET https://mcp.zovo.one/mcp/connect mints a token and prints a ready URL.

npm publish for @theluckystrike/mcp-change-order is pending, so the npx line below returns 404 today.

Claude Desktop

~/Library/Application Support/Claude/claude_desktop_config.json (macOS) or %APPDATA%\Claude\claude_desktop_config.json (Windows):

json
{  "mcpServers": {    "change-order": {      "command": "npx",      "args": ["-y", "@theluckystrike/mcp-change-order"]    }  }}

Claude Code

sh
claude mcp add change-order -- npx -y @theluckystrike/mcp-change-order

Cursor

~/.cursor/mcp.json (global) or .cursor/mcp.json (project), same entry as Claude Desktop.

Tools

ToolWhat it does
change_order_createRaise a change order against a quote or work order: reference, client, title, date, and the original contract value on the first one
change_order_add_lineAdd an added, removed or changed line to a draft, with its quantity, unit price in minor units, reason and date
change_order_statusMove it along: draft to sent, sent to approved or rejected, draft or sent to void, each step dated
change_order_getOne change order in full: every line with its delta, the VAT, the history and the running value of the reference
change_order_listChange orders by reference, status, client and date range, with approved and pending deltas per currency
change_order_deleteDelete an empty draft raised by mistake. Free on every tier
contract_valueThe running value of one reference: original, approved delta, current value, pending delta held apart
change_order_documentThe change order as a plain-text document for the client to approve
change_order_invoice_payloadThe approved delta as invoice_create items (MAJOR units) and quote_create items (MINOR units)
license_status / license_activateFree or Pro, and where to upgrade

Free vs Pro

FreePro
Open change orders (draft and sent)5unlimited
Lines per change order200200
Raise, line, move, get, list, deleteyesyes
Running contract valueyesyes
Change order documentnoyes
Invoice-ready delta payload, both scalesnoyes

The cap counts OPEN change orders, the ones the client has not answered, not the ones you have ever raised. Approving, rejecting or voiding one frees its slot, and so does change_order_delete on a draft with no lines; all of those are free on every tier, because a way back that only a Pro key can reach is not a way back.

Get Pro: https://mcp.zovo.one/buy/change-order (one-time $19, lifetime), or all servers for $39: https://mcp.zovo.one/buy/bundle

The status machine

draft to sent; sent to approved or rejected; draft or sent to void. Approved, rejected and void are final. A draft cannot be approved directly: approval is the client's answer to something they were sent. Lines are added only while a change order is a draft; a sent one that needs another line is voided and raised again, so the client's approval always refers to what they were sent. Every step carries its own date, and a step dated before the last one is refused.

Where the money comes from

This server keeps no arithmetic of its own. computeTotals, currencyDecimals, formatMoney and roundHalfUp are imported from @theluckystrike/mcp-invoice/lib, the corrupt-store quarantine from @theluckystrike/mcp-timezone/lib, the timezone-aware "today" from @theluckystrike/mcp-quotes/lib. The VAT rate, the currency and the business name come from the shared business profile that business_set in the invoice server writes. Nothing is written outside this server's own directory, and no sibling store is opened.

The measured insight

A changed line is two items, not one, because one net item shows the customer nothing they can check. A line that goes from 3 x EUR 450.00 to 5 x EUR 420.00 is worth +EUR 750.00, and the tempting payload is one item of quantity 1 at EUR 750.00. The customer cannot reproduce that figure from anything on the change order they signed. The payload this server emits is a reversal, -3 x EUR 450.00, and the revised line, 5 x EUR 420.00; each reproduces on a calculator, and computeTotals over both is the same +EUR 750.00, because the invoice server's roundHalfUp is symmetric in sign. The same rule carries a removal as a negative quantity at the unit price it was booked at, which invoice_create accepts. The unit suite re-runs the invoice server's own computeTotals over the payload as returned and asserts the four item values and the three totals, then feeds the quote_create items into the same engine as though their MINOR figure were MAJOR and asserts the net is exactly 100x, so the day someone "simplifies" the payload to one net item, or moves a field between the two scales, the build says so instead of the customer.

Privacy

All data stays on your machine, in ${XDG_DATA_HOME:-~/.local/share}/mcp-servers/change-order/. Nothing is sent anywhere. There is no account and no API key. License keys are verified offline. This server reads one file it does not own, the shared business profile, and writes into no store but its own.

Built by theluckystrike. https://github.com/theluckystrike

Use these docs as an MCP server

Any MCP client (Claude, Cursor, Windsurf, VS Code) can read this repository's documentation directly via GitMCP - no install:

來源:servers/change-order/README.md,提交 6535b33

工具

11

change_order_create

Raise a change order

Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

輸入參數datenotetitle必填client必填currencyreference必填duplicate_okreference_kindoriginal_value_minor

change_order_add_line

Add a changed line

Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

輸入參數datekind必填notereason必填quantity必填tax_ratedescription必填change_order必填was_quantityunit_price_minor必填was_unit_price_minor

change_order_status

Move a change order along

Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

輸入參數datenotestatus必填change_order必填

change_order_get

Show one change order

Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.

輸入參數change_order必填

change_order_list

List change orders

List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.

輸入參數tofromlimitclientstatusreference

change_order_delete

Delete an empty draft

Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.

輸入參數change_order必填

contract_value

Running contract value

The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

輸入參數reference必填

change_order_document

Change order document

Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.

輸入參數change_order必填

change_order_invoice_payload

Invoice payload for an approved delta

Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

輸入參數tax_rateissue_datechange_order必填

license_status

License status

Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.

無需輸入參數。

license_activate

Activate license

Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.

輸入參數key必填

版本歷史

4
  1. v0.23.0最新Nov 3, 2026
  2. v0.22.6Oct 14, 2026
  3. v0.22.0Sep 17, 2026
  4. v0.21.0Sep 16, 2026

評分

已滿足適用檢查項的 100%

該評分衡量此收錄條目的完整程度,依據註冊中心條目、端點與公開來源計算得出。它不是對伺服器本身的評價,也不表示伺服器安全或目前可用:可連通性是帶日期的檢查結果,評分也不包含安裝量或使用者評價。

  • 近 30 天內可連通必需25 分
  • 已宣告認證方式必需10 分
  • 已列出工具必需15 分
  • 描述必需15 分
  • 圖示10 分
  • 文件15 分
  • 授權條款10 分