Draw Schedule: multifamily construction financing

loan.multifamilyconstruction由 multifamilyconstruction.loan 發布官方發布者v1.2026.1101.0更新於 Nov 3, 2026

公寓建築貸款:HUD、銀行與基金規則比較,規模測算,人口普查開工量與建設週期。

AI 翻譯由 AI 模型根據下方的原文描述翻譯,可能有誤。

原文描述

Apartment construction loans: HUD vs bank vs fund rules, sizing, Census starts and build times.

已驗證Streamable HTTP可網頁執行

概覽

Draw Schedule: multifamily construction financing 的託管 MCP 服務(multifamilyconstruction.loan),由 multifamilyconstruction.loan 發布;無需登入;Streamable HTTP;4 個工具。

暫無 AI 概覽:以下資訊來自註冊中心條目和服務本身。

發布者
multifamilyconstruction.loan
端點
multifamilyconstruction.loan
最近檢查

安裝

在 SourceWeft 中

  1. 開啟 儀表板中的 Draw Schedule: multifamily construction financing,將其新增到工作區。
  2. 為需要使用其工具的對話啟用該服務。

Web executable,透過 Streamable HTTP。 遠端服務在工作區中設定後即可從網頁執行環境執行。

交給代理程式安裝

把這段提示詞貼上到 Claude Code、Codex、Cursor 等代理程式,或 SourceWeft 對話中。代理程式會讀取該伺服器的安裝指南,先向你展示發布者、端點和登入方式,經你同意後再把它新增到你的客戶端。金鑰不會寫進任何命令。

閱讀 https://sourceweft.com/mcp/loan.multifamilyconstruction%2Fmultifamilyconstruction-loan/install.md,並按其中說明把這個 MCP 伺服器接入我的客戶端。修改任何設定之前,先告訴我它的發布者、端點和登入方式,等我確認。不要把 API 金鑰寫進命令或我會提交的檔案;問我金鑰應從哪裡取得。

檢視代理程式所依據的安裝指南

其他 MCP 客戶端

把它新增到你客戶端的 mcpServers 設定中。

{
  "mcpServers": {
    "draw-schedule-multifamily-construction-f": {
      "type": "http",
      "url": "https://multifamilyconstruction.loan/mcp"
    }
  }
}

工具

4

compare_construction_options

Compare HUD, bank, debt fund and LIHTC construction financing

Side-by-side rules for financing apartment construction four ways: HUD 221(d)(4), a bank construction loan, a debt fund and 4% tax credits with bonds. For each: maximum loan size and the rule behind it, rate type, term, coverage test, extra costs and process, with the regulation or HUD letter cited.

輸入參數programs

size_construction_loan

Size a multifamily construction loan three ways

Runs the site's construction loan sizer on your project: the HUD 221(d)(4) loan (lower of 87%/90% of cost and the 1.15/1.11 coverage test, with HUD's construction-interest estimate and upfront MIP), the bank regulatory ceiling (80% of value and 15%-of-value HVCRE equity, plus your bank's loan-to-cost if given) and, if you give its loan-to-cost, a debt fund. Returns loan, binding limit, equity needed and interest.

輸入參數rentsbank_ltc_pctfund_ltc_pcthud_rate_pctstabilized_noi必填bank_spread_pctfund_spread_pctas_completed_value必填construction_monthstotal_development_cost必填

get_construction_market

Apartment construction market: starts, pipeline and bank lending standards

Latest U.S. apartment construction numbers for 5+ unit buildings from the Census Bureau (starts, permits, units under construction, completions; seasonally adjusted annual rate, with year-ago and the pipeline peak) and the Federal Reserve's loan officer survey on construction and multifamily lending standards and demand, plus 30-day SOFR. Optional monthly history.

輸入參數history_months

get_build_timeline

How long apartment construction takes, by region

Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.

輸入參數yearregionbuilding_size

版本歷史

1
  1. v1.2026.1101.0最新Nov 3, 2026

評分

已滿足適用檢查項的 83%

該評分衡量此收錄條目的完整程度,依據註冊中心條目、端點與公開來源計算得出。它不是對伺服器本身的評價,也不表示伺服器安全或目前可用:可連通性是帶日期的檢查結果,評分也不包含安裝量或使用者評價。

  • 近 30 天內可連通必需25 分
  • 已宣告認證方式必需10 分
  • 已列出工具必需15 分
  • 描述必需15 分
  • 圖示10 分
  • 文件15 分

    請宣告包含 README 的 GitHub 儲存庫,或在 OAuth 受保護資源後設資料中提供 resource_documentation。

  • 授權條款不適用

    託管服務按其提供方的條款使用,因此這裡不要求授權條款。此檢查項不計入百分比。