calculate_pue
Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
cooling_kw必填it_load_kw必填lighting_kw必填ups_losses_kw必填tech.novtriq由 novtriq.tech 發布官方發布者v1.0.0更新於 Oct 24, 2026
27 engineering compliance and calculation tools for the built environment (UK, EU, UAE).
提供 27 個面向英國、歐盟與阿聯建築環境的工程合規與計算工具。
Web executable,透過 Streamable HTTP。 遠端服務在工作區中設定後即可從網頁執行環境執行。
把這段提示詞貼上到 Claude Code、Codex、Cursor 等代理程式,或 SourceWeft 對話中。代理程式會讀取該伺服器的安裝指南,先向你展示發布者、端點和登入方式,經你同意後再把它新增到你的客戶端。金鑰不會寫進任何命令。
閱讀 https://sourceweft.com/mcp/tech.novtriq%2Fengineering/install.md,並按其中說明把這個 MCP 伺服器接入我的客戶端。修改任何設定之前,先告訴我它的發布者、端點和登入方式,等我確認。不要把 API 金鑰寫進命令或我會提交的檔案;問我金鑰應從哪裡取得。把它新增到你客戶端的 mcpServers 設定中。
{
"mcpServers": {
"engineering": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
cooling_kw必填it_load_kw必填lighting_kw必填ups_losses_kw必填Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.
sector必填has_ciso必填has_ir_plan必填has_ot_policy必填has_24h_reporting必填has_ot_monitoring必填organisation_size必填has_asset_inventory必填has_board_reporting必填has_supplier_assessment必填has_network_segmentation必填Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.
country必填year_built必填current_epc必填has_solar_pv必填building_type必填floor_area_m2必填heating_system必填Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.
it_load_kw必填redundancy必填space_type必填climate_zone必填floor_area_m2必填occupancy_persons必填Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.
emirate必填has_bep必填ifc_export必填bim_software必填building_type必填has_bim_model必填building_floors必填building_area_m2必填Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.
emirate必填has_isms必填is_cloud_hosted必填organisation_type必填has_incident_response必填has_third_party_audit必填has_data_classification必填has_vulnerability_assessment必填Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.
intended_use必填site_location必填voltage_level必填has_existing_supply必填power_requirement_mw必填target_completion_year必填Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.
geography必填disciplines必填building_type必填gross_area_m2必填timeline_weeks必填transaction_type必填Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.
country必填building_type必填floor_area_m2必填energy_kwh_yearconstruction_yearThermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.
it_load_kw必填redundancy必填lighting_kwcooling_type必填room_area_m2必填ambient_temp_c必填ups_efficiency_pct必填Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.
team_size必填hourly_rate必填manual_hours必填software_costefficiency_gain_pct必填implementation_time_months必填Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.
location必填occupancyyear_built必填refrigerantgas_kwh_yearbuilding_type必填elec_kwh_yearfloor_area_m2必填heat_kwh_yearrenewable_pctBuilding Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.
bim必填floors必填location必填condition必填structure必填year_built必填current_use必填proposed_use必填Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.
gradeconfig必填span_m必填exposurematerial必填udl_kn_m必填fire_ratingload_positionpoint_load_knEurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.
sectiondepth_mmmaterial必填width_mmaxial_load_kn必填buckling_curveeccentricity_mmreinforcement_pcteffective_length_m必填Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices.
bimcountry必填programmeprocurementproject_type必填floor_area_m2必填specificationDGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.
answers必填cert_targetNIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report.
answers必填purposeEPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.
eraaddresscountryheating必填current_epc必填building_typefloor_area_m2必填UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA.
listedlocationproposal必填article_4use_classproposed_useproperty_type必填conservation_areaextension_depth_mnational_park_aonbUK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative.
works必填dwellingsbuilding_type必填parking_spaces必填covered_car_parkUK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative.
floor_area_m2必填location_risk必填glazing_area_m2必填cross_ventilationmost_glazed_facade必填provided_free_area_m2England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties.
property_type必填current_epc_band必填Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured.
storeysage_band必填location必填flow_temp_cfloor_area_m2必填air_change_rateceiling_height_mglazing_pct_of_floorexternal_design_temp_cinternal_design_temp_cEU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values.
it_power_kw必填it_energy_kwh必填water_input_m3reused_heat_kwhtotal_energy_kwh必填renewable_energy_kwhUAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats.
gas_m3emirate必填gas_kwhelectricity_kwh必填UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.
sap_ratingfloor_area_m2annual_energy_kwh已滿足適用檢查項的 72%
該評分衡量此收錄條目的完整程度,依據註冊中心條目、端點與公開來源計算得出。它不是對伺服器本身的評價,也不表示伺服器安全或目前可用:可連通性是帶日期的檢查結果,評分也不包含安裝量或使用者評價。
請在註冊中心條目中發布圖示。
請宣告包含 README 的 GitHub 儲存庫,或在 OAuth 受保護資源後設資料中提供 resource_documentation。
託管服務按其提供方的條款使用,因此這裡不要求授權條款。此檢查項不計入百分比。