Plan Do Check Act

NeoLabHQ/context-engineering-kit/antigravity/skills/plan-do-check-act

by NeoLabHQ23e2428e809d77717f8acc9659c374a3a1fcb93eNo licenseListed Oct 9, 2026Updated Oct 9, 2026

Iterative PDCA cycle for systematic experimentation and continuous improvement

Instructions onlyProductivity & Workflow
AI-generated overview

Guides an iterative Plan-Do-Check-Act cycle for systematic experimentation and continuous improvement.

What it does
This skill walks an agent through a four-phase PDCA cycle: Plan (define the problem, baseline, root causes, hypothesis, experiment and success criteria), Do (implement the change at small scale and collect data), Check (measure results against criteria and baseline), and Act (standardize, adjust, or start a new cycle). It produces structured cycle documentation, including hypotheses, measurements, analysis and next steps. Worked examples cover build time, production bugs and code review speed.
When to use it
Use it when tackling an improvement goal or recurring problem that benefits from measurable, iterative experimentation rather than a single large change. It suits process or technical improvements where baselines, hypotheses and success criteria can be defined and results compared across cycles.
Requirements
No scripts or special tooling; it is instructions only. It references optional companion commands such as /why, /cause-and-effect and /analyse-problem, and expects the user to supply an improvement goal.

Plan-Do-Check-Act (PDCA)

Apply PDCA cycle for continuous improvement through iterative problem-solving and process optimization.

Description

Four-phase iterative cycle: Plan (identify and analyze), Do (implement changes), Check (measure results), Act (standardize or adjust). Enables systematic experimentation and improvement.

Usage

/plan-do-check-act [improvement_goal]

Variables

  • GOAL: Improvement target or problem to address (default: prompt for input)
  • CYCLE_NUMBER: Which PDCA iteration (default: 1)

Steps

Phase 1: PLAN

  1. Define the problem or improvement goal
  2. Analyze current state (baseline metrics)
  3. Identify root causes (use /why or /cause-and-effect)
  4. Develop hypothesis: "If we change X, Y will improve"
  5. Design experiment: what to change, how to measure success
  6. Set success criteria (measurable targets)

Phase 2: DO

  1. Implement the planned change (small scale first)
  2. Document what was actually done
  3. Record any deviations from plan
  4. Collect data throughout implementation
  5. Note unexpected observations

Phase 3: CHECK

  1. Measure results against success criteria
  2. Compare to baseline (before vs. after)
  3. Analyze data: did hypothesis hold?
  4. Identify what worked and what didn't
  5. Document learnings and insights

Phase 4: ACT

  1. If successful: Standardize the change
    • Update documentation
    • Train team
    • Create checklist/automation
    • Monitor for regression
  2. If unsuccessful: Learn and adjust
    • Understand why it failed
    • Refine hypothesis
    • Start new PDCA cycle with adjusted plan
  3. If partially successful:
    • Standardize what worked
    • Plan next cycle for remaining issues

Examples

Example 1: Reducing Build Time

CYCLE 1───────PLAN:  Problem: Docker build takes 45 minutes  Current State: Full rebuild every time, no layer caching  Root Cause: Package manager cache not preserved between builds  Hypothesis: Caching dependencies will reduce build to <10 minutes  Change: Add layer caching for package.json + node_modules  Success Criteria: Build time <10 minutes on unchanged dependencies
DO:  - Restructured Dockerfile: COPY package*.json before src files  - Added .dockerignore for node_modules  - Configured CI cache for Docker layers  - Tested on 3 builds
CHECK:  Results:    - Unchanged dependencies: 8 minutes ✓ (was 45)    - Changed dependencies: 12 minutes (was 45)    - Fresh builds: 45 minutes (same, expected)  Analysis: 82% reduction on cached builds, hypothesis confirmed
ACT:  Standardize:    ✓ Merged Dockerfile changes    ✓ Updated CI pipeline config    ✓ Documented in README    ✓ Added build time monitoring    New Problem: 12 minutes still slow when deps change  → Start CYCLE 2
CYCLE 2───────PLAN:  Problem: Build still 12 min when dependencies change  Current State: npm install rebuilds all packages  Root Cause: Some packages compile from source  Hypothesis: Pre-built binaries will reduce to <5 minutes  Change: Use npm ci instead of install, configure binary mirrors  Success Criteria: Build <5 minutes on dependency changes
DO:  - Changed to npm ci (uses package-lock.json)  - Added .npmrc with binary mirror configs  - Tested across 5 dependency updates
CHECK:  Results:    - Dependency changes: 4.5 minutes ✓ (was 12)    - Compilation errors reduced to 0 (was 3)  Analysis: npm ci faster + more reliable, hypothesis confirmed
ACT:  Standardize:    ✓ Use npm ci everywhere (local + CI)    ✓ Committed .npmrc    ✓ Updated developer onboarding docs    Total improvement: 45min → 4.5min (90% reduction)  ✓ PDCA complete, monitor for 2 weeks

Example 2: Reducing Production Bugs

CYCLE 1───────PLAN:  Problem: 8 production bugs per month  Current State: Manual testing only, no automated tests  Root Cause: Regressions not caught before release  Hypothesis: Adding integration tests will reduce bugs by 50%  Change: Implement integration test suite for critical paths  Success Criteria: <4 bugs per month after 1 month
DO:  Week 1-2: Wrote integration tests for:    - User authentication flow    - Payment processing    - Data export  Week 3: Set up CI to run tests  Week 4: Team training on test writing  Coverage: 3 critical paths (was 0)
CHECK:  Results after 1 month:    - Production bugs: 6 (was 8)    - Bugs caught in CI: 4    - Test failures (false positives): 2  Analysis: 25% reduction, not 50% target  Insight: Bugs are in areas without tests yet
ACT:  Partially successful:    ✓ Keep existing tests (prevented 4 bugs)    ✓ Fix flaky tests    Adjust for CYCLE 2:    - Expand test coverage to all user flows    - Add tests for bug-prone areas    → Start CYCLE 2
CYCLE 2───────PLAN:  Problem: Still 6 bugs/month, need <4  Current State: 3 critical paths tested, 12 paths total  Root Cause: UI interaction bugs not covered by integration tests  Hypothesis: E2E tests for all user flows will reach <4 bugs  Change: Add E2E tests for remaining 9 flows  Success Criteria: <4 bugs per month, 80% coverage
DO:  Week 1-3: Added E2E tests for all user flows  Week 4: Set up visual regression testing  Coverage: 12/12 user flows (was 3/12)
CHECK:  Results after 1 month:    - Production bugs: 3 ✓ (was 6)    - Bugs caught in CI: 8 (was 4)    - Test maintenance time: 3 hours/week  Analysis: Target achieved! 62% reduction from baseline
ACT:  Standardize:    ✓ Made tests required for all PRs    ✓ Added test checklist to PR template    ✓ Scheduled weekly test review    ✓ Created runbook for test maintenance    Monitor: Track bug rate and test effectiveness monthly  ✓ PDCA complete

Example 3: Improving Code Review Speed

PLAN:  Problem: PRs take 3 days average to merge  Current State: Manual review, no automation  Root Cause: Reviewers wait to see if CI passes before reviewing  Hypothesis: Auto-review + faster CI will reduce to <1 day  Change: Add automated checks + split long CI jobs  Success Criteria: Average time to merge <1 day (8 hours)
DO:  - Set up automated linter checks (fail fast)  - Split test suite into parallel jobs  - Added PR template with self-review checklist  - CI time: 45min → 15min  - Tracked PR merge time for 2 weeks
CHECK:  Results:    - Average time to merge: 1.5 days (was 3)    - Time waiting for CI: 15min (was 45min)    - Time waiting for review: 1.3 days (was 2+ days)  Analysis: CI faster, but review still bottleneck
ACT:  Partially successful:    ✓ Keep fast CI improvements    Insight: Real bottleneck is reviewer availability, not CI  Adjust for new PDCA:    - Focus on reviewer availability/notification    - Consider rotating review assignments  → Start new PDCA cycle with different hypothesis

Notes

  • Start with small, measurable changes (not big overhauls)
  • PDCA is iterative—multiple cycles normal
  • Failed experiments are learning opportunities
  • Document everything: easier to see patterns across cycles
  • Success criteria must be measurable (not subjective)
  • Phase 4 "Act" determines next cycle or completion
  • If stuck after 3 cycles, revisit root cause analysis
  • PDCA works for technical and process improvements
  • Use /analyse-problem (A3) for comprehensive documentation

Source and attribution

Source:NeoLabHQ/context-engineering-kitinantigravity/skills/plan-do-check-actat commit23e2428

License: No license

Content belongs to its original authors. SourceWeft indexes it from a public repository.

Report or request removal