Pre-Mortem
Identify failure modes before they occur by systematically questioning plans, designs, and implementations. Based on Gary Klein's technique, popularized by Shreyas Doshi (Stripe).
Usage
Core Concept
"Imagine it's 3 months from now and this project has failed spectacularly. Why did it fail?"
Risk Categories (Shreyas Framework)
CRITICAL: Verify Before Flagging
Do NOT flag risks based on pattern-matching alone. Every potential tiger MUST go through verification.
The False Positive Problem
Common mistakes that create false tigers:
- Seeing a hardcoded path without checking for
if exists():fallback - Finding missing feature X without asking "is X in scope?"
- Flagging code at line N without reading lines N±20 for context
- Assuming error case isn't handled without tracing the code
Verification Checklist (REQUIRED)
Before flagging ANY tiger, verify:
If ANY verification check is "no" or "unknown", DO NOT flag as tiger.
Required Evidence Format
Every tiger MUST include:
If you cannot fill in mitigation_checked with specific evidence, it's not a verified tiger.
Workflow
Step 1: Detect Context & Depth
Step 2: Run Appropriate Checklist
Quick Checklist (Plans, PRs)
Run through these mentally, note any that apply:
Core Questions:
- What's the single biggest thing that could go wrong?
- Any external dependencies that could fail?
- Is rollback possible if this breaks?
- Edge cases not covered in tests?
- Unclear requirements that could cause rework?
Output Format:
Deep Checklist (Before Implementation)
Work through each category systematically:
Technical Risks:
- Scalability: Works at 10x/100x current load?
- Dependencies: External services + fallbacks defined?
- Data: Availability, consistency, migrations clear?
- Latency: SLA requirements will be met?
- Security: Auth, injection, OWASP considered?
- Error handling: All failure modes covered?
Integration Risks:
- Breaking changes identified?
- Migration path defined?
- Rollback strategy exists?
- Feature flags needed?
Process Risks:
- Requirements clear and complete?
- All stakeholder input gathered?
- Tech debt being tracked?
- Maintenance burden understood?
Testing Risks:
- Coverage gaps identified?
- Integration test plan exists?
- Load testing needed?
- Manual testing plan defined?
Output Format:
Step 3: Present Risks via AskUserQuestion
BLOCKING: Present findings and require user decision.
Step 4: Handle User Response
If "Accept risks and proceed"
If "Add mitigations to plan"
If "Research mitigation options"
If "Discuss specific risks"
Step 5: Update Plan (if mitigations added)
If user added mitigations, append to the plan:
Integration Points
In create_plan / plan-agent
After plan structure is approved, before ExitPlanMode: