Ralph TUI - Create Beads (beads-rust)
Converts PRDs to beads (epic + child tasks) for ralph-tui autonomous execution using beads-rust (br CLI).
Note: This skill uses the
brcommand from beads-rust. If you have the original beads (bd) installed instead, use theralph-tui-create-beadsskill.
The Job
Take a PRD (markdown file or text) and create beads using br commands:
- Extract Quality Gates from the PRD's "Quality Gates" section
- Create an epic bead for the feature
- Create child beads for each user story (with quality gates appended)
- Set up dependencies between beads (schema → backend → UI)
- Output ready for
ralph-tui run --tracker beads-rust
Step 1: Extract Quality Gates
Look for the "Quality Gates" section in the PRD:
Extract:
- Universal gates: Commands that apply to ALL stories (e.g.,
pnpm typecheck) - UI gates: Commands that apply only to UI stories (e.g., browser verification)
If no Quality Gates section exists: Ask the user what commands should pass, or use a sensible default like npm run typecheck.
Output Format
Beads use br create command with HEREDOC syntax to safely handle special characters:
CRITICAL: Always use
<<'EOF'(single-quoted) for the HEREDOC delimiter. This prevents shell interpretation of backticks,$variables, and()in descriptions.
Story Size: The #1 Rule
Each story must be completable in ONE ralph-tui iteration (~one agent context window).
ralph-tui spawns a fresh agent instance per iteration with no memory of previous work. If a story is too big, the agent runs out of context before finishing.
Right-sized stories:
- Add a database column + migration
- Add a UI component to an existing page
- Update a server action with new logic
- Add a filter dropdown to a list
Too big (split these):
- "Build the entire dashboard" → Split into: schema, queries, UI components, filters
- "Add authentication" → Split into: schema, middleware, login UI, session handling
- "Refactor the API" → Split into one story per endpoint or pattern
Rule of thumb: If you can't describe the change in 2-3 sentences, it's too big.
Story Ordering: Dependencies First
Stories execute in dependency order. Earlier stories must not depend on later ones.
Correct order:
- Schema/database changes (migrations)
- Server actions / backend logic
- UI components that use the backend
- Dashboard/summary views that aggregate data
Wrong order:
- ❌ UI component (depends on schema that doesn't exist yet)
- ❌ Schema change
Dependencies with br dep add
Use the br dep add command to specify which beads must complete first:
Syntax: br dep add <issue> <depends-on> — the issue depends on (is blocked by) depends-on.
ralph-tui will:
- Show blocked beads as "blocked" until dependencies complete
- Never select a bead for execution while its dependencies are open
- Include dependency context in the prompt when working on a bead
Correct dependency order:
- Schema/database changes (no dependencies)
- Backend logic (depends on schema)
- UI components (depends on backend)
- Integration/polish (depends on UI)
Acceptance Criteria: Quality Gates + Story-Specific
Each bead's description should include acceptance criteria with:
- Story-specific criteria from the PRD (what this story accomplishes)
- Quality gates from the PRD's Quality Gates section (appended at the end)
Good criteria (verifiable):
- "Add
investorTypecolumn to investor table with default 'cold'" - "Filter dropdown has options: All, Cold, Friend"
- "Clicking toggle shows confirmation dialog"
Bad criteria (vague):
- ❌ "Works correctly"
- ❌ "User can do X easily"
- ❌ "Good UX"
- ❌ "Handles edge cases"
Conversion Rules
- Extract Quality Gates from PRD first
- Each user story → one bead
- First story: No dependencies (creates foundation)
- Subsequent stories: Depend on their predecessors (UI depends on backend, etc.)
- Priority: Based on dependency order, then document order (0=critical, 2=medium, 4=backlog)
- All stories:
status: "open" - Acceptance criteria: Story criteria + quality gates appended
- UI stories: Also append UI-specific gates (browser verification)
Splitting Large PRDs
If a PRD has big features, split them:
Original:
"Add friends outreach track with different messaging"
Split into:
- US-001: Add investorType field to database
- US-002: Add type toggle to investor list UI
- US-003: Create friend-specific phase progression logic
- US-004: Create friend message templates
- US-005: Wire up task generation for friends
- US-006: Add filter by type
- US-007: Update new investor form
- US-008: Update dashboard counts
Each is one focused change that can be completed and verified independently.
Example
Input PRD:
Output beads:
Syncing Changes
After creating beads, sync to export to JSONL (for git tracking):
This exports the SQLite database to .beads/issues.jsonl for version control.
Output Location
Beads are stored in: .beads/ directory (SQLite DB + JSONL export)
After creation, run ralph-tui:
ralph-tui will:
- Work on beads within the specified epic (or select the best available task)
- Close each bead when complete
- Close the epic when all children are done
- Output
<promise>COMPLETE</promise>when epic is done
Checklist Before Creating Beads
- Extracted Quality Gates from PRD (or asked user if missing)
- Each story is completable in one iteration (small enough)
- Stories are ordered by dependency (schema → backend → UI)
- Quality gates appended to every bead's acceptance criteria
- UI stories have browser verification (if specified in Quality Gates)
- Acceptance criteria are verifiable (not vague)
- No story depends on a later story (only earlier stories)
- Dependencies added with
br dep addafter creating beads - Ran
br sync --flush-onlyto export for git tracking