Planning and Task Breakdown
Overview
Decompose work into small, verifiable tasks with explicit acceptance criteria. Good task breakdown is the difference between an agent that completes work reliably and one that produces a tangled mess. Every task should be small enough to implement, test, and verify in a single focused session.
When to Use
- You have a spec and need to break it into implementable units
- A task feels too large or vague to start
- Work needs to be parallelized across multiple agents or sessions
- You need to communicate scope to a human
- The implementation order isn't obvious
When NOT to use: Single-file changes with obvious scope, or when the spec already contains well-defined tasks.
The Planning Process
Step 1: Enter Plan Mode
Before writing any code, operate in read-only mode:
- Read the spec and relevant codebase sections
- Identify existing patterns and conventions
- Map dependencies between components
- Note risks and unknowns
Do NOT write code during planning. The output is a plan document saved to tasks/plan.md and a task list recorded in the task list target (see Output Files; default tasks/todo.md), not implementation.
Step 2: Identify the Dependency Graph
Map what depends on what:
Implementation order follows the dependency graph bottom-up: build foundations first.
Step 3: Slice Vertically
Instead of building all the database, then all the API, then all the UI — build one complete feature path at a time:
Bad (horizontal slicing):
Good (vertical slicing):
Each vertical slice delivers working, testable functionality.
Step 4: Write Tasks
Each task follows this structure, whether it lands in the markdown task list or as an item in an external tracker (see Output Files):
Step 5: Order and Checkpoint
Arrange tasks so that:
- Dependencies are satisfied (build foundation first)
- Each task leaves the system in a working state
- Verification checkpoints occur after every 2-3 tasks
- High-risk tasks are early (fail fast)
Add explicit checkpoints to the task list target:
Task Sizing Guidelines
If a task is L or larger, it should be broken into smaller tasks. An agent performs best on S and M tasks.
When to break a task down further:
- It would take more than one focused session (roughly 2+ hours of agent work)
- You cannot describe the acceptance criteria in 3 or fewer bullet points
- It touches two or more independent subsystems (e.g., auth and billing)
- You find yourself writing "and" in the task title (a sign it is two tasks)
Output Files
- Plan document: Save the implementation plan to
tasks/plan.md. This is always a markdown file — design decisions, risks, and open questions don't map cleanly onto individual tracker issues. - Task list: Record each task in the task list target (defined below).
Create the tasks/ directory if it does not exist.
Never overwrite an incomplete plan. Before writing tasks/plan.md or tasks/todo.md, check whether they already exist and still contain unchecked tasks:
- Same work being replanned (the user asked to revise or extend this plan) → update the existing files in place.
- Different work → stop and ask. The unchecked tasks may be mid-build in another session. Do not delete, overwrite, or rename the existing files on your own; present the conflict and let the user decide (finish the old plan first, explicitly discard it, or tell you where the new plan should go).
The same rule applies to an external task list target: never bulk-close or delete another plan's open tracker items to make room for new ones.
Task List Target
The task list target is where tasks and checkpoints are recorded. It is defined once, here; every other reference in this skill defers to it.
- Default: a checklist-style markdown file at
tasks/todo.md. This is the convention the/buildcommand and other downstream tooling expect. Use it unless the project says otherwise. - External tracker: if the project's agent rules (
CLAUDE.md,AGENTS.md, etc.) or the user designate an issue tracker (e.g. GitHub Issues, Jira, Linear,bd/beads), create one tracker item per task instead of writingtasks/todo.md. Map the Step 4 structure onto the tracker's fields: acceptance criteria and verification steps in the item body, dependencies via the tracker's linking mechanism (bd dep add, "blocked by", etc.). Record Step 5 checkpoints as tracker items too, or as a checklist in the plan document if the tracker has no natural equivalent.
When using an external tracker, note it in tasks/plan.md (e.g. "Tasks tracked in Linear project FOO") so downstream steps and future sessions know where to look, and keep the plan document's Task List section as an ordered index of tracker item IDs or links rather than a duplicate checklist.
Plan Document Template
When tasks live in an external tracker, keep the Task List section above as an ordered index of tracker item IDs or links instead of a duplicate checklist.
Parallelization Opportunities
When multiple agents or sessions are available:
- Safe to parallelize: Independent feature slices, tests for already-implemented features, documentation
- Must be sequential: Database migrations, shared state changes, dependency chains
- Needs coordination: Features that share an API contract (define the contract first, then parallelize)
Common Rationalizations
Red Flags
- Starting implementation without a written task list
- Overwriting a
tasks/plan.mdortasks/todo.mdthat still has unchecked tasks for different work, without asking - Writing
tasks/todo.mdwhen the project has designated an external tracker (or scattering tasks across both) - Tasks that say "implement the feature" without acceptance criteria
- No verification steps in the plan
- All tasks are XL-sized
- No checkpoints between tasks
- Dependency order isn't considered
Verification
Before starting implementation, confirm:
- Every task has acceptance criteria
- Every task has a verification step
- Task dependencies are identified and ordered correctly
- Tasks are recorded in the task list target (default
tasks/todo.md) - No pre-existing incomplete plan was overwritten without explicit user confirmation
- No task touches more than ~5 files
- Checkpoints exist between major phases
- The human has reviewed and approved the plan
See Also
Acceptance criteria are per-task and answer "did we build the right thing?". They sit on top of the project-wide Definition of Done, the standing bar every task clears before it counts as done. See ../../references/definition-of-done.md.