Chronograph Budget Vs Actuals Variance

作者 chronograph-pe35cb3d12cf4e无许可证收录于 2026年10月8日更新于 2026年10月8日仓库3周前更新

Compare portfolio company operating actuals against budget/plan, compute variances, flag off-plan companies, and roll up to the fund, using Chronograph company metrics.

仅含说明Business & Finance
AI 生成的概览

将投资组合公司的实际经营数据与预算或计划对比,计算差异,标记偏离计划的公司并汇总到基金层面。

功能
通过 Chronograph 的 company-metrics 工具获取投资组合公司的经营指标(如收入、EBITDA 及其他跟踪的 KPI),同时取得实际值与预算/计划情景的数据。它按指标计算金额差异和百分比差异,标注有利或不利,标记超出可配置阈值(默认正负 10%)的公司,并展示各期间的差异趋势。随后将结果汇总到基金层面,输出包含各公司差异表、偏离计划标记、覆盖情况说明以及必需免责声明页脚的结果。
适用场景
适用于 GP 价值创造或监控团队跟踪经营业绩与计划的对比,例如预算与实际对比审查、差异分析、识别哪些公司偏离计划,或查看投资组合公司相对预算的表现。不适用于估值变动或完整公司报告,这些由其他 Chronograph 技能处理。
运行要求
需要以 GP 客户身份连接 Chronograph MCP 服务器;不附带脚本。

Budget vs. Actuals Variance

Requirements: A connected Chronograph MCP server as a GP client.

Overview

Compare portfolio company operating results (revenue, EBITDA, and other tracked KPIs) against budget or plan for the same periods, compute the variance in amount and percent, flag companies tracking off-plan beyond a threshold, trend the variance over time, and roll up to the fund.

Scenarios — how budget and actuals are distinguished

Company operating metrics are retrieved with the company-metrics tool, which exposes a Scenario field that separates budget/plan figures from actuals. Scenario labels are client-specific — a client may name them differently (e.g. "Budget", "Plan", "Forecast", "Actual") and may carry more than one budget scenario (original vs. revised, or multiple cases). Before computing any variance:

  1. Query company-metrics to see which Scenario values exist for the company.
  2. Confirm with the user which Scenario represents actuals and which represents the budget/plan to compare against (and which to ignore) — do not assume from the labels.
  3. Apply the confirmed scenarios consistently across every company and period in the analysis.

Workflow

  1. Resolve scope: a single company, a set, or the whole fund; and the periods to compare.
  2. Establish the Scenario mapping (above) — confirm the actuals and budget scenarios with the user.
  3. Pull the tracked metrics (revenue, gross profit, EBITDA, and any KPIs in scope) from company-metrics for both the actuals and budget scenarios, same periods.
  4. Compute variance per metric: actual − budget, and percent variance; label favorable/unfavorable.
  5. Flag companies off-plan beyond a threshold (default ±10%, configurable); trend variance across periods to show whether gaps are widening or closing.
  6. Roll up to the fund and present per-company variance with off-plan flags and a coverage note.

Chronograph MCP usage

Use the company-metrics tool for operating metrics; prefer platform metric types over display labels (same discipline as the one-pager), and select the Scenario per the confirmed mapping. Make the metric-discovery call before querying. Never default currency to USD; display — where a value is unavailable.

Output standards

  • Disclaimer footer (required). Every rendered deliverable (HTML page, Excel sheet, PDF, or document) must show a footer on each page/sheet, and any chat-only output must close with the same line: For informational purposes only — not investment advice. Source: Chronograph · as of {as-of date}.
  • Per-company variance table: metric, period, actual, budget, Δ amount, Δ %, favorable/unfavorable.
  • State which Scenario values were used for actuals vs. budget.
  • Off-plan flags and a fund roll-up, plus coverage (which companies had both scenarios available).

Guardrails

  • No autonomous actions. Draft and flag only; never approve, execute, or externally distribute. LP-facing or external distribution requires human (e.g. IR/CCO) sign-off outside this skill.
  • Draft analyst work product for operating monitoring — not investment, audit, or valuation advice.
  • Distinguish actuals from budget/plan; never present a plan-scenario figure as an actual.
  • Never fabricate budget or actual values; if a company lacks a budget scenario, flag it rather than estimating.
  • If the Chronograph connector is not available, do not reference Chronograph-specific schemas, private tool names, field mappings, or retrieval recipes.

来源与署名

来源:chronograph-pe/chronograph-gp-claude-plugin位于skills/chronograph-budget-vs-actuals-variance提交35cb3d1

许可证: 无许可证

内容归原作者所有。SourceWeft 从公开仓库中收录这些内容。

举报或申请下架