Log Activity

作者 mondaycom8fdc0b4af07a無授權條款收錄於 2026年10月8日更新於 2026年10月8日

Log calls, meetings, notes, and other activities to CRM item timelines — structured records with attendees, outcomes, and follow-ups. Use when someone says "log my call with", "add a note to the deal", "what activities happened on", "record this meeting", "update my note on", "track a call with", "log a meeting with", "what's the activity history for", "add meeting notes to", "I just spoke with", "note on the account", or "update the activity I logged".

AI 產生的概覽

將通話、會議與備註記錄到 monday CRM 項目時間軸,並可讀取或更新既有活動項目。

功能
此技能會把通話、會議等結構化活動或純文字備註寫入已定位的 CRM 項目(商機、聯絡人、潛在客戶或客戶)時間軸。它也能依時間範圍讀取某個項目的活動歷史,並更新既有的時間軸項目。所有寫入或更新動作在執行前都會要求人工確認;結構化活動建立失敗時會退回為一般時間軸備註。
適用情境
當使用者需要針對某筆 CRM 記錄記錄通話、會議或備註,查看某個項目發生過哪些活動,或修正已記錄的項目時使用。它著重單一項目的活動歷史,而非團隊層級的彙總統計。
執行需求
需要 monday CRM 的 MCP 連接器,包含使用者身分、搜尋、看板資訊、自訂活動、時間軸項目與時間軸備註等工具,並需要連線至該服務的網路。未附帶指令碼,僅為指示。若無法載入活動類型,會退回為純文字備註。

Log Activity

Flow: Trigger → Detect intent (log / read / update) → Resolve CRM item → Gather activity details → Execute → Confirm.

Input

  • Optional: activity description via argument (e.g., "call with Acme about renewal").
  • Optional: CRM item name or identifier if mentioned.

Output

  • Log (create): structured activity record (call, meeting, note) on the target item's timeline, with confirmation.
  • Read: formatted activity history for the specified item and time range.
  • Update: edited timeline entry with confirmation of changes.

Knowledge

  • Timeline = the activity feed on any CRM item (deal, contact, lead, account).
  • Activity types: calls, meetings, notes, emails (read-only from timeline), custom types per account.
  • For aggregated stats (team totals, rep comparisons), use the activity-insights skill — get-activity-insights is more efficient than counting raw timeline items.
  • Timeline items are append-only in the UI; the API allows updates to existing entries.
  • update-timeline-item visibility on external connector is unconfirmed — degrade gracefully if it fails.

Tools (MCP)

  • get-custom-activities — list activity types configured on the account (call, meeting, note, custom).
  • get-timeline-items — read an item's timeline (activities, emails, notes).
  • create-timeline-item — log a structured activity (call, meeting) with type, date, attendees, notes.
  • update-timeline-item — edit an existing timeline activity's content.
  • create-timeline-note — add a free-text note to an item's timeline.
  • get_user_context — user identity for attribution.
  • search / get_board_info / get_board_items_page — resolve CRM items by name or company.

Cross-skill handoffs

  • From meeting-to-opportunity: after a meeting recap, suggest logging the meeting as a structured activity on the deal.
  • From run-sequence: when a sequence triggers a manual call step, suggest logging the call outcome.
  • To morning-briefing: logged activities feed the daily brief's "recent activity" section.
  • From daily-briefing: brief surfaces items with no activity in N days → suggest logging.
  • To activity-insights: when the user asks about team totals or rep comparisons rather than a specific item's history.

Step 0: Connector check + activity types

Goal: Confirm connector works and cache available activity types.

  1. Try mcp__monday__get_user_context. On error → print install prompt, stop.
  2. Try mcp__monday__get-custom-activities.
  3. If successful → cache the list of activity types (id, name, icon) for use in Step 3. Set activities_available: true.
  4. If permission error or tool unavailable → set activities_available: false. The skill can still operate with create_timeline_note (free-text notes don't require activity-type resolution), but structured activities (calls, meetings) will degrade to notes. Print: "Activity types couldn't be loaded — I can still add notes to timelines. Structured call/meeting logging may be limited."

Step 1: Detect intent

Parse the user's argument to classify:

IntentTrigger signals
log"log", "record", "add", "note on", "track", "I just spoke with", default
read"what activities", "activity history", "what happened on", "show timeline"
update"update the note", "edit the activity", "change the meeting note", "correct"

If ambiguous and no CRM item mentioned, ask:

"Would you like to (a) log a new activity, (b) view activity history, or (c) update an existing entry?"


Step 2: Resolve CRM item

Goal: Find the specific deal, contact, lead, or account the activity relates to.

  1. Extract item identifier from the argument:

    • Company name ("Acme", "Globex", "TechCorp")
    • Contact name ("Johnson", "Sarah at Acme")
    • Deal name ("Q2 renewal", "enterprise upgrade")
    • Item ID (if explicitly given)
  2. If name extracted → mcp__monday__search({ query: "<name>", objectTypes: ["ITEM"] }).

    • Single result → use it.
    • Multiple results → present top 5 with board context: "Found multiple matches: (1) Acme Corp [Deals board] (2) Acme Inc [Leads board] (3) Acme - renewal [Deals board]. Which one?"
    • Zero results → broaden: try partial name, try get_board_items_page on likely boards (Deals, Contacts, Leads). Still zero → ask user.
  3. If no name in argument → ask: "Which CRM item should I log this activity on? (company name, deal name, or contact name)"

  4. Once resolved, note the itemId and boardId for subsequent calls.


Step 3: Execute — Log (Create)

3a: Determine activity type

If activities_available: true:

  1. Parse the user's description for type signals:
    • "call", "spoke with", "phoned", "rang" → call
    • "meeting", "met with", "demo", "presentation" → meeting
    • "note", "add a note", "reminder", "FYI" → note (free-text)
  2. If unclear, present available types: "What type of activity? (call / meeting / note / <custom types from account>)"

If activities_available: false:

  • Default to free-text note via create_timeline_note.

3b: Gather details

Based on type, collect (ask only what's missing from the argument):

Call:

  • Date/time (default: now)
  • Duration (optional)
  • Attendees/contacts (optional)
  • Outcome/summary (required — at least one line)
  • Follow-up action (optional)

Meeting:

  • Date/time (default: now)
  • Duration (optional)
  • Attendees (optional)
  • Summary/key points (required)
  • Next steps (optional)

Note:

  • Content (required)
  • That's it — notes are lightweight.

Parsing heuristic: extract as much as possible from the original argument before asking.

3c: Confirm and write

HITL GATE: Present the structured activity: "Log this to <item name>?"

Type: CallDate: 2026-06-23 10:00Summary: They want to renew but need pricing by FridayFollow-up: Send pricing by Friday

(yes / edit / cancel)

On "yes":

  • For structured activities: mcp__monday__create-timeline-item({ itemId, activityType, date, content: { summary, attendees, followUp } }).
  • For notes: mcp__monday__create-timeline-note({ itemId, content: "<note text>" }).

Report: "Logged <type> on <item name>. Timeline updated."

If the tool call fails, fall back to create_timeline_note with the same content formatted as text. Inform: "Couldn't log as a structured <type> — added as a timeline note instead."


Step 4: Execute — Read

  1. mcp__monday__get-timeline-items({ itemId }).
  2. Parse time filter from argument (this week / last 7 days / today / default last 10).
  3. Format output as a table with Date, Type, Summary columns.
  4. If zero activities: "No activities on <item name> in <window>. Want to log one now?"
  5. For team-wide aggregated stats (totals by rep or type), use the activity-insights skill instead.

Step 5: Execute — Update

  1. Retrieve timeline: mcp__monday__get-timeline-items({ itemId }).
  2. Present recent entries; resolve which to update from context or by asking.
  3. Collect the edit.

HITL GATE: "Update this entry on <item name>?"

Before: "Demo scheduled for next week"After: "Demo scheduled for next week. Decision moved to July."

(yes / edit / cancel)

  1. mcp__monday__update-timeline-item({ timelineItemId, content: <updated content> }).
  2. If tool fails: surface error and suggest editing directly in monday CRM.

Shared patterns

  • HITL gates on all writes and updates.
  • Parse-first, ask-second.
  • Graceful type degradation — if structured activity creation fails, fall back to create-timeline-note.
  • No deletes — timeline entries cannot be removed via MCP.
  • Attribution — entries carry the user's identity from get_user_context.

Error handling reference

FailureBehavior
Connector missingStep 0 stops; print install link.
Activity types unavailableDegrade to notes; inform user.
CRM item not foundBroaden search; ask user.
Create fails (invalid type)Fall back to create-timeline-note; inform user.
Update failsSurface error; suggest editing in monday CRM UI.
Timeline empty on readOffer to log a new activity.
Tool unavailable (Gateway)"Activity logging tools aren't available on the connector yet — use the monday CRM UI for now."

Completion criteria

  • Step 0 connector check passed; activity types cached or degraded gracefully.
  • Intent correctly classified (log / read / update).
  • CRM item resolved before any write.
  • Every write/update went through HITL confirmation.
  • Structured activities used when available; notes as fallback.
  • No timeline entries deleted (hard rail).
  • Errors surfaced with actionable guidance.

來源與署名

來源:mondaycom/mcp位於plugins/monday-crm/skills/log-activity提交8fdc0b4

授權條款: 無授權條款

內容歸原作者所有。SourceWeft 從公開儲存庫中收錄這些內容。

檢舉或申請下架