Tool Design Sprint Readiness

product-on-purpose/pm-skills/skills/tool-design-sprint-readiness

作者 product-on-purpose1cef1a9eae10017389863d51e289e0ae41e17fcbApache-2.0收錄於 2026年10月9日更新於 2026年10月9日

Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a team is considering starting a Design Sprint and wants a fast yes/no diagnosis before committing five days of team time and customer recruiting cost.

AI 產生的概覽

判斷團隊應該立即進行設計衝刺、延後,還是先完成前置工作。

功能
這是一個僅含說明的技能,依八項標準進行 30 至 45 分鐘的就緒度診斷,涵蓋挑戰界定、利害關係、決策者可用性、團隊規模、行程清空、客戶接觸、原型可行性以及後續推進路徑。它產出一份包含六個部分的成果物:Go、Conditional Go 或 Wait 的結論,現況診斷,建議的前置條件,參與人員名單,客戶招募計畫,以及衝刺前活動。技能以決策者檢查點收尾,由決策者確認結論並承諾關鍵出席時段。
適用情境
適用於團隊正在考慮進行設計衝刺,希望在投入五天團隊時間和客戶招募成本之前快速取得是或否的診斷。也適用於剛完成 Foundation Sprint、正在權衡設計衝刺、較小規模實驗或直接開發的團隊,或需要確認已排定衝刺的前置條件是否到位的團隊。
執行需求
無需指令碼或軟體套件,僅為說明性技能。依賴代理閱讀其 SKILL.md 與參考檔案,並依賴團隊提供挑戰描述、既有假設、客戶接觸狀態、決策者可用性和團隊組成草案等輸入。
<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Design Sprint Readiness

Assess whether a Design Sprint fits the team's current situation. Design Sprint failure modes are expensive: five consecutive days of a 4-7 person team, plus customer recruiting cost (typically 5 strangers paid honoraria), plus the prototype build. A 30-45 minute readiness diagnostic catches the failure modes before that commitment is made.

Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.

When to Use

  • A team is considering starting a Design Sprint and needs a fast diagnosis before committing five days plus customer recruiting effort.
  • A team has just completed a Foundation Sprint and is deciding whether the next test should be a Design Sprint, a smaller experiment, or direct build. The Founding Hypothesis is consumed as optional input context (no separate bridge skill artifact is required).
  • An existing sprint commitment is on the calendar and the team wants to validate that prerequisites (Decider, customers, prototype medium) are in place.
  • Re-running a Design Sprint after an inconclusive first sprint: use to confirm the new challenge framing and customer access are ready.

When NOT to Use

  • The team has already decided to run the sprint and just needs the brief. Use tool-design-sprint-brief instead.
  • The team has no clear challenge and is still in discovery. Run problem framing or a Foundation Sprint first; a Design Sprint depends on a sprint-worthy challenge.
  • Low-stakes tweaks where five days of team time would be disproportionate. Use a lighter experiment design instead.
  • No customer access for Friday testing and no realistic recruiting plan. A Design Sprint that cannot test on Friday is just a four-day workshop with no learning event.
  • No Decider available and one cannot be appointed. Design Sprint requires fast decisions Wednesday and pre-test Thursday; without authority the sprint produces options without commitment.

What This Skill Produces

A single bundled artifact with six sections:

  1. Readiness verdict: Go / Conditional Go / Wait
  2. Diagnosis: what is in place, what is missing, what is uncertain
  3. Recommended preconditions (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint
  4. Recommended attendee list (when verdict is Go or Conditional Go): the 4-7 people who should be in the room, with role expectations
  5. Customer recruiting plan (when verdict is Go or Conditional Go): target profile, source, count, incentive, recruiter owner, recruiting deadline (typically 7-10 days before Friday)
  6. Pre-sprint activities (when verdict is Go): the prep work to complete in the days before Monday

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for a worked example using the Brainshelf book-catalog thread.

Inference Inputs

The skill runs an inference pass over these inputs to produce the verdict:

InputWhat the skill does with it
Challenge descriptionDetermines whether the challenge is sprint-worthy (specific enough to prototype in 4 days; big enough to justify 5 team-days)
Existing hypothesis (from Foundation Sprint or elsewhere)Confirms there is a testable bet, not exploratory discovery. Highest-risk assumption from the FS scorecard becomes a candidate sprint question
Customer access statusCritical. Without realistic Friday customer access, the sprint cannot test
Decider name and full-week availabilityConfirms Decider can attend at least Monday morning, Wednesday morning (heat map + supervote), and Friday afternoon (Decider review); ideally all 5 days
Team composition draftChecks roster against the 4-7 person band; flags missing roles (engineering for prototype build, design for sketching, researcher or PM for customer interviews)
Prototype medium feasibilityConfirms a 1-day prototype is achievable in the chosen medium (clickable, slideware, service role-play, paper, physical mock)
(Optional) Logistics constraintsConfirms five consecutive days can actually be cleared by all attendees

If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before Monday.

Readiness Criteria (8 Canonical Checks)

The skill evaluates the team against these eight criteria, drawn from Sprint (Knapp, Zeratsky, Kowitz), GV "Is Your Idea Sprint-Worthy?", and Character Capital's Design Sprint guide:

  1. Challenge is named and sprint-worthy. Specific enough to prototype in 4 days; big enough that a wrong direction would be costly.
  2. Stakes are meaningful. The team would otherwise hesitate, debate, or default to building blindly. The sprint is justified by what it replaces.
  3. Decider is available for the load-bearing moments. Minimum: Monday morning (framing), Wednesday morning (heat map + supervote), Friday afternoon (Decider review). Ideally all 5 days.
  4. Team size is appropriate (4-7). Smaller than 4 weakens skill coverage; larger than 7 slows decision-making.
  5. Team can clear 5 consecutive days. No partial attendance for core participants; cameo experts may attend specific sessions.
  6. Customer access for Friday testing is secured (or recruitable in 7-10 days). 5 target-profile customers, paid honoraria, scheduled for Friday morning to early afternoon.
  7. Prototype medium is feasible in 1 day. Clickable (Figma), slideware (Keynote), service role-play, paper, physical mock, or other medium that can be built Thursday by 2 people.
  8. Sprint output has a path forward. The team is ready to act on validation (build, iterate, pivot to backup, or stop) when Friday's scorecard lands. Sprints without a downstream commitment become orphaned learnings.
PatternVerdict
All 8 criteria met cleanlyGo
1-2 criteria are "yellow flags" but addressable in the 1-2 weeks before MondayConditional Go with documented prep
3 or more criteria fail, or any of 1, 3, or 6 is a hard failWait with recommended prerequisite work

Treat the criteria as load-bearing, not a checklist to game. A team that papers over no-customer-access with "we'll figure it out by Thursday" should get a Wait, not a Conditional Go.

Common Pitfalls

  • Sprint theater. Leadership has already decided what to build; the sprint is being run for political cover. The Friday scorecard cannot change the decision. If this is the situation, the honest verdict is Wait, and the team should escalate the misalignment rather than burn 5 days.
  • No Decider, or Decider-by-committee. A "Decider for the week" who lacks real authority cannot make the Wednesday supervote stick. If the genuine Decider cannot attend the load-bearing moments, postpone.
  • No customer access for Friday. This is the most common cause of failed sprints. Recruiting 5 strangers takes 7-10 days; recruiting starts as soon as readiness is Go, not Monday. If access is uncertain, the verdict is Wait until a recruiter and source are confirmed.
  • Challenge too broad to fit one week. "Redesign onboarding" is too broad; "design and test the first-time signup flow for B2B trial customers" is sprint-sized. If the challenge cannot be bounded, do problem framing first.
  • Conflating Design Sprint with Foundation Sprint. Foundation Sprint chooses strategic direction (2 days, no prototype, no customers). Design Sprint validates a chosen direction (5 days, prototype, customers). If the team has not chosen a direction, they need Foundation Sprint first, not Design Sprint.
  • Skipping the diagnostic because "we're going to run it anyway." Same failure mode as FS readiness: the cost of the diagnostic is 45 minutes; the cost of a failed sprint is 35-40 person-days plus customer honoraria plus opportunity cost.

Canonical Sources

Cross-Skill Usage

This skill is the entry point of the design-sprint-skills family. It has no prerequisites (the metadata.prerequisites field is intentionally empty).

When the verdict is Go, the natural next invocation is tool-design-sprint-brief to lock challenge, team, recruiting plan, prototype medium, and logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, Foundation Sprint, customer recruiting setup) before re-invoking this skill.

A team coming directly from a Foundation Sprint should bring the Founding Hypothesis as input context. The hypothesis's highest-risk assumption (typically marked in the FS assumption scorecard) becomes the lead candidate sprint question for tool-design-sprint-brief (which locks the sprint questions); tool-design-sprint-map-and-target on Monday then refines the locked questions during the morning. No bridge skill exists or is required; the narrative handoff is described in _workflows/foundation-to-design.md and in both user guides.

tool-note-and-vote may be invoked once during the readiness conversation if the team disagrees on whether a Design Sprint is the right tool (vs. a smaller experiment or direct build). In practice, the diagnostic is usually conclusive.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on the verdict (Go / Conditional Go / Wait), accepts the diagnosis, and explicitly commits to the load-bearing attendance windows. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint and the recruiting work.