Scrum Master

alirezarezvani/claude-skills/project-management/skills/scrum-master

作者 alirezarezvani19392f7a0826MIT27K 个星标收录于 2026年10月8日更新于 2026年10月8日仓库5周前更新

Advanced Scrum Master skill for data-driven agile team analysis and coaching. Use when the user asks about sprint planning, velocity tracking, retrospectives, standup facilitation, backlog grooming, story points, burndown charts, blocker resolution, or agile team health. Runs Python scripts to analyse sprint JSON exports from Jira or similar tools: velocity_analyzer.py for Monte Carlo sprint forecasting, sprint_health_scorer.py for multi-dimension health scoring, and retrospective_analyzer.py for action-item and theme tracking. Produces confidence-interval forecasts, health grade reports, and improvement-velocity trends for high-performing Scrum teams.

AI 生成的概览

以数据驱动的 Scrum Master 技能,分析冲刺 JSON 数据,生成速度预测、团队健康评分与回顾洞察。

功能
通过三个随附的 Python 脚本处理冲刺 JSON 导出数据:velocity_analyzer.py 执行滚动平均、趋势检测和带置信区间的蒙特卡洛预测;sprint_health_scorer.py 对六个加权健康维度评分并给出 0-100 的总分;retrospective_analyzer.py 跟踪行动项完成情况、反复出现的主题和团队成熟度。技能还提供冲刺计划、每日站会、冲刺评审和回顾的工作流程,以及团队发展评估与干预指导。输出包括文本或 JSON 报告、预测、健康评分和改进趋势。
适用场景
适用于用户询问冲刺计划、速度跟踪、回顾、站会主持、待办事项梳理、故事点、燃尽图、障碍解决或敏捷团队健康时。适合拥有 Jira 或类似工具导出的冲刺数据、希望获得量化分析与引导建议的 Scrum Master 和敏捷教练。对于数据不足两到三个冲刺的团队并不适用,此时脚本只能给出有限或部分分析。
运行要求
需要 Python 运行环境来执行随附的三个脚本(velocity_analyzer.py、sprint_health_scorer.py、retrospective_analyzer.py)。输入为符合 assets/sample_sprint_data.json 架构的冲刺 JSON 数据,通常来自 Jira 或类似工具的导出并映射到该架构。未说明需要凭据或网络访问。

Scrum Master Expert

Data-driven Scrum Master skill combining sprint analytics, probabilistic forecasting, and team development coaching. The unique value is in the three Python analysis scripts and their workflows — refer to references/ and assets/ for deeper framework detail.


Table of Contents


Analysis Tools & Usage

1. Velocity Analyzer (scripts/velocity_analyzer.py)

Runs rolling averages, linear-regression trend detection, and Monte Carlo simulation over sprint history.

bash
# Text reportpython velocity_analyzer.py sprint_data.json --format text
# JSON output for downstream processingpython velocity_analyzer.py sprint_data.json --format json > analysis.json

Outputs: velocity trend (improving/stable/declining), coefficient of variation, 6-sprint Monte Carlo forecast at 50 / 70 / 85 / 95% confidence intervals, anomaly flags with root-cause suggestions.

Validation: If fewer than 3 sprints are present in the input, stop and prompt the user: "Velocity analysis needs at least 3 sprints. Please provide additional sprint data." 6+ sprints are recommended for statistically significant Monte Carlo results.


2. Sprint Health Scorer (scripts/sprint_health_scorer.py)

Scores team health across 6 weighted dimensions, producing an overall 0–100 grade.

DimensionWeightTarget
Commitment Reliability25%>85% sprint goals met
Scope Stability20%<15% mid-sprint changes
Blocker Resolution15%<3 days average
Ceremony Engagement15%>90% participation
Story Completion Distribution15%High ratio of fully done stories
Velocity Predictability10%CV <20%
bash
python sprint_health_scorer.py sprint_data.json --format text

Outputs: overall health score + grade, per-dimension scores with recommendations, sprint-over-sprint trend, intervention priority matrix.

Validation: Requires 2+ sprints with ceremony and story-completion data. If data is missing, report which dimensions cannot be scored and ask the user to supply the gaps.


3. Retrospective Analyzer (scripts/retrospective_analyzer.py)

Tracks action-item completion, recurring themes, sentiment trends, and team maturity progression.

bash
python retrospective_analyzer.py sprint_data.json --format text

Outputs: action-item completion rate by priority/owner, recurring-theme persistence scores, team maturity level (forming/storming/norming/performing), improvement-velocity trend.

Validation: Requires 3+ retrospectives with action-item tracking. With fewer, note the limitation and offer partial theme analysis only.


Input Requirements

All scripts accept JSON following the schema in assets/sample_sprint_data.json:

json
{  "team_info": { "name": "string", "size": "number", "scrum_master": "string" },  "sprints": [    {      "sprint_number": "number",      "planned_points": "number",      "completed_points": "number",      "stories": [...],      "blockers": [...],      "ceremonies": {...}    }  ],  "retrospectives": [    {      "sprint_number": "number",      "went_well": ["string"],      "to_improve": ["string"],      "action_items": [...]    }  ]}

Jira and similar tools can export sprint data; map exported fields to this schema before running the scripts. See assets/sample_sprint_data.json for a complete 6-sprint example and assets/expected_output.json for corresponding expected results (velocity avg 20.2 pts, CV 12.7%, health score 78.3/100, action-item completion 46.7%).


Sprint Execution Workflows

Sprint Planning

  1. Run velocity analysis: python velocity_analyzer.py sprint_data.json --format text
  2. Use the 70% confidence interval as the recommended commitment ceiling for the sprint backlog.
  3. Review the health scorer's Commitment Reliability and Scope Stability scores to calibrate negotiation with the Product Owner.
  4. If Monte Carlo output shows high volatility (CV >20%), surface this to stakeholders with range estimates rather than single-point forecasts.
  5. Document capacity assumptions (leave, dependencies) for retrospective comparison.

Daily Standup

  1. Track participation and help-seeking patterns — feed ceremony data into sprint_health_scorer.py at sprint end.
  2. Log each blocker with date opened; resolution time feeds the Blocker Resolution dimension.
  3. If a blocker is unresolved after 2 days, escalate proactively and note in sprint data.

Sprint Review

  1. Present velocity trend and health score alongside the demo to give stakeholders delivery context.
  2. Capture scope-change requests raised during review; record as scope-change events in sprint data for next scoring cycle.

Sprint Retrospective

  1. Run all three scripts before the session:
    bash
    python sprint_health_scorer.py sprint_data.json --format text > health.txtpython retrospective_analyzer.py sprint_data.json --format text > retro.txt
  2. Open with the health score and top-flagged dimensions to focus discussion.
  3. Use the retrospective analyzer's action-item completion rate to determine how many new action items the team can realistically absorb (target: ≤3 if completion rate <60%).
  4. Assign each action item an owner and measurable success criterion before closing the session.
  5. Record new action items in sprint_data.json for tracking in the next cycle.

Team Development Workflow

Assessment

bash
python sprint_health_scorer.py team_data.json > health_assessment.txtpython retrospective_analyzer.py team_data.json > retro_insights.txt
  • Map retrospective analyzer maturity output to the appropriate development stage.
  • Supplement with an anonymous psychological safety pulse survey (Edmondson 7-point scale) and individual 1:1 observations.
  • If maturity output is forming or storming, prioritise safety and conflict-facilitation interventions before process optimisation.

Intervention

Apply stage-specific facilitation (details in references/team-dynamics-framework.md):

StageFocus
FormingStructure, process education, trust building
StormingConflict facilitation, psychological safety maintenance
NormingAutonomy building, process ownership transfer
PerformingChallenge introduction, innovation support

Progress Measurement

  • Sprint cadence: re-run health scorer; target overall score improvement of ≥5 points per quarter.
  • Monthly: psychological safety pulse survey; target >4.0/5.0.
  • Quarterly: full maturity re-assessment via retrospective analyzer.
  • If scores plateau or regress for 2 consecutive sprints, escalate intervention strategy (see references/team-dynamics-framework.md).

Key Metrics & Targets

MetricTarget
Overall Health Score>80/100
Psychological Safety Index>4.0/5.0
Velocity CV (predictability)<20%
Commitment Reliability>85%
Scope Stability<15% mid-sprint changes
Blocker Resolution Time<3 days
Ceremony Engagement>90%
Retrospective Action Completion>70%

Limitations

  • Sample size: fewer than 6 sprints reduces Monte Carlo confidence; always state confidence intervals, not point estimates.
  • Data completeness: missing ceremony or story-completion fields suppress affected scoring dimensions — report gaps explicitly.
  • Context sensitivity: script recommendations must be interpreted alongside organisational and team context not captured in JSON data.
  • Quantitative bias: metrics do not replace qualitative observation; combine scores with direct team interaction.
  • Team size: techniques are optimised for 5–9 member teams; larger groups may require adaptation.
  • External factors: cross-team dependencies and organisational constraints are not fully modelled by single-team metrics.

Related Skills

  • Agile Product Owner (product-team/agile-product-owner/) — User stories and backlog feed sprint planning
  • Senior PM (project-management/senior-pm/) — Portfolio health context informs sprint priorities

For deep framework references see references/velocity-forecasting-guide.md and references/team-dynamics-framework.md. For template assets see assets/sprint_report_template.md and assets/team_health_check_template.md.