Plan Do Check Act

NeoLabHQ/context-engineering-kit/skills/plan-do-check-act

作者 NeoLabHQ23e2428e809d77717f8acc9659c374a3a1fcb93e无许可证收录于 2026年10月9日更新于 2026年10月9日

Iterative PDCA cycle for systematic experimentation and continuous improvement

AI 生成的概览

引导迭代式 PDCA(计划-执行-检查-处理)循环,用于系统化实验与持续改进。

功能
该技能引导智能体依次完成四个 PDCA 阶段:计划(定义问题、基线、根因、假设、实验与成功标准)、执行(小范围实施变更并收集数据)、检查(对照标准与基线衡量结果)、处理(标准化、调整或开启新一轮循环)。它产出结构化的改进记录,包含假设、测量结果与后续步骤,并配有缩短构建时间、减少生产缺陷、加快代码评审等示例。
适用场景
当你希望通过可衡量、可迭代的实验来改进流程或解决反复出现的问题,而不是一次性大改动时使用。它适用于能够定义基线、假设和成功标准的技术或流程改进目标。
运行要求
无需脚本或特殊工具,仅为指令说明。文中提及可选的配套命令,如 /why、/cause-and-effect 和 /analyse-problem,但并非必需。

Plan-Do-Check-Act (PDCA)

Apply PDCA cycle for continuous improvement through iterative problem-solving and process optimization.

Description

Four-phase iterative cycle: Plan (identify and analyze), Do (implement changes), Check (measure results), Act (standardize or adjust). Enables systematic experimentation and improvement.

Usage

/plan-do-check-act [improvement_goal]

Variables

  • GOAL: Improvement target or problem to address (default: prompt for input)
  • CYCLE_NUMBER: Which PDCA iteration (default: 1)

Steps

Phase 1: PLAN

  1. Define the problem or improvement goal
  2. Analyze current state (baseline metrics)
  3. Identify root causes (use /why or /cause-and-effect)
  4. Develop hypothesis: "If we change X, Y will improve"
  5. Design experiment: what to change, how to measure success
  6. Set success criteria (measurable targets)

Phase 2: DO

  1. Implement the planned change (small scale first)
  2. Document what was actually done
  3. Record any deviations from plan
  4. Collect data throughout implementation
  5. Note unexpected observations

Phase 3: CHECK

  1. Measure results against success criteria
  2. Compare to baseline (before vs. after)
  3. Analyze data: did hypothesis hold?
  4. Identify what worked and what didn't
  5. Document learnings and insights

Phase 4: ACT

  1. If successful: Standardize the change
    • Update documentation
    • Train team
    • Create checklist/automation
    • Monitor for regression
  2. If unsuccessful: Learn and adjust
    • Understand why it failed
    • Refine hypothesis
    • Start new PDCA cycle with adjusted plan
  3. If partially successful:
    • Standardize what worked
    • Plan next cycle for remaining issues

Examples

Example 1: Reducing Build Time

CYCLE 1───────PLAN:  Problem: Docker build takes 45 minutes  Current State: Full rebuild every time, no layer caching  Root Cause: Package manager cache not preserved between builds  Hypothesis: Caching dependencies will reduce build to <10 minutes  Change: Add layer caching for package.json + node_modules  Success Criteria: Build time <10 minutes on unchanged dependencies
DO:  - Restructured Dockerfile: COPY package*.json before src files  - Added .dockerignore for node_modules  - Configured CI cache for Docker layers  - Tested on 3 builds
CHECK:  Results:    - Unchanged dependencies: 8 minutes ✓ (was 45)    - Changed dependencies: 12 minutes (was 45)    - Fresh builds: 45 minutes (same, expected)  Analysis: 82% reduction on cached builds, hypothesis confirmed
ACT:  Standardize:    ✓ Merged Dockerfile changes    ✓ Updated CI pipeline config    ✓ Documented in README    ✓ Added build time monitoring    New Problem: 12 minutes still slow when deps change  → Start CYCLE 2
CYCLE 2───────PLAN:  Problem: Build still 12 min when dependencies change  Current State: npm install rebuilds all packages  Root Cause: Some packages compile from source  Hypothesis: Pre-built binaries will reduce to <5 minutes  Change: Use npm ci instead of install, configure binary mirrors  Success Criteria: Build <5 minutes on dependency changes
DO:  - Changed to npm ci (uses package-lock.json)  - Added .npmrc with binary mirror configs  - Tested across 5 dependency updates
CHECK:  Results:    - Dependency changes: 4.5 minutes ✓ (was 12)    - Compilation errors reduced to 0 (was 3)  Analysis: npm ci faster + more reliable, hypothesis confirmed
ACT:  Standardize:    ✓ Use npm ci everywhere (local + CI)    ✓ Committed .npmrc    ✓ Updated developer onboarding docs    Total improvement: 45min → 4.5min (90% reduction)  ✓ PDCA complete, monitor for 2 weeks

Example 2: Reducing Production Bugs

CYCLE 1───────PLAN:  Problem: 8 production bugs per month  Current State: Manual testing only, no automated tests  Root Cause: Regressions not caught before release  Hypothesis: Adding integration tests will reduce bugs by 50%  Change: Implement integration test suite for critical paths  Success Criteria: <4 bugs per month after 1 month
DO:  Week 1-2: Wrote integration tests for:    - User authentication flow    - Payment processing    - Data export  Week 3: Set up CI to run tests  Week 4: Team training on test writing  Coverage: 3 critical paths (was 0)
CHECK:  Results after 1 month:    - Production bugs: 6 (was 8)    - Bugs caught in CI: 4    - Test failures (false positives): 2  Analysis: 25% reduction, not 50% target  Insight: Bugs are in areas without tests yet
ACT:  Partially successful:    ✓ Keep existing tests (prevented 4 bugs)    ✓ Fix flaky tests    Adjust for CYCLE 2:    - Expand test coverage to all user flows    - Add tests for bug-prone areas    → Start CYCLE 2
CYCLE 2───────PLAN:  Problem: Still 6 bugs/month, need <4  Current State: 3 critical paths tested, 12 paths total  Root Cause: UI interaction bugs not covered by integration tests  Hypothesis: E2E tests for all user flows will reach <4 bugs  Change: Add E2E tests for remaining 9 flows  Success Criteria: <4 bugs per month, 80% coverage
DO:  Week 1-3: Added E2E tests for all user flows  Week 4: Set up visual regression testing  Coverage: 12/12 user flows (was 3/12)
CHECK:  Results after 1 month:    - Production bugs: 3 ✓ (was 6)    - Bugs caught in CI: 8 (was 4)    - Test maintenance time: 3 hours/week  Analysis: Target achieved! 62% reduction from baseline
ACT:  Standardize:    ✓ Made tests required for all PRs    ✓ Added test checklist to PR template    ✓ Scheduled weekly test review    ✓ Created runbook for test maintenance    Monitor: Track bug rate and test effectiveness monthly  ✓ PDCA complete

Example 3: Improving Code Review Speed

PLAN:  Problem: PRs take 3 days average to merge  Current State: Manual review, no automation  Root Cause: Reviewers wait to see if CI passes before reviewing  Hypothesis: Auto-review + faster CI will reduce to <1 day  Change: Add automated checks + split long CI jobs  Success Criteria: Average time to merge <1 day (8 hours)
DO:  - Set up automated linter checks (fail fast)  - Split test suite into parallel jobs  - Added PR template with self-review checklist  - CI time: 45min → 15min  - Tracked PR merge time for 2 weeks
CHECK:  Results:    - Average time to merge: 1.5 days (was 3)    - Time waiting for CI: 15min (was 45min)    - Time waiting for review: 1.3 days (was 2+ days)  Analysis: CI faster, but review still bottleneck
ACT:  Partially successful:    ✓ Keep fast CI improvements    Insight: Real bottleneck is reviewer availability, not CI  Adjust for new PDCA:    - Focus on reviewer availability/notification    - Consider rotating review assignments  → Start new PDCA cycle with different hypothesis

Notes

  • Start with small, measurable changes (not big overhauls)
  • PDCA is iterative—multiple cycles normal
  • Failed experiments are learning opportunities
  • Document everything: easier to see patterns across cycles
  • Success criteria must be measurable (not subjective)
  • Phase 4 "Act" determines next cycle or completion
  • If stuck after 3 cycles, revisit root cause analysis
  • PDCA works for technical and process improvements
  • Use /analyse-problem (A3) for comprehensive documentation