Tool Design Sprint Map And Target

product-on-purpose/pm-skills/skills/tool-design-sprint-map-and-target

作者 product-on-purpose1cef1a9eae10017389863d51e289e0ae41e17fcbApache-2.0收录于 2026年10月9日更新于 2026年10月9日

Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.

AI 生成的概览

引导设计冲刺周一工作坊,产出包含长期目标、冲刺问题、地图、HMW 聚类与目标时刻的整合文档。

功能
引导团队完成设计冲刺第一天(周一)的流程:撰写长期目标,把团队担忧转化为 3-7 个可测试的冲刺问题,绘制 5-15 步的客户或系统地图,记录专家访谈笔记,聚类“我们可以如何”(HMW)便签,并由决策者选定目标时刻。它产出一份包含上述六个部分的整合文档,结构见 references/TEMPLATE.md,示例见 references/EXAMPLE.md。它还给出约 7 小时的周一议程和 105 分钟的主持综合时间盒,并调用便签投票机制用于 HMW 聚类,必要时也用于目标选择。
适用场景
适用于设计冲刺第一天、冲刺简报已锁定、团队全员参与周一工作坊且已安排专家访谈时。其目的是让团队从宽泛的挑战收敛到一个具体的目标时刻,供周二的草图与周三的故事板使用。不适用于简报未锁定、缺少决策者或已预先决定目标的情况。
运行要求
仅为说明文档,不附带脚本。需要来自前置简报技能的已锁定冲刺简报、现有研究、分析数据、客户案例,以及周一当天收集的专家访谈记录。它引用便签投票与周二草图等配套技能,并引用书籍和网络指南等外部资料。
<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Design Sprint Map and Target (Monday)

Produce Monday's bundled artifact: the long-term goal that names success in 1-5 years; 3-7 sprint questions converting team fears into testable risks; a 5-15 step customer or system map from key player to outcome; expert interview notes from cameo experts run in parallel; HMW (How Might We) clusters synthesized from the team; and the Decider's chosen target moment. Monday's output becomes Tuesday's design target.

Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.

When to Use

  • It is Day 1 of the Design Sprint and the brief is locked (via tool-design-sprint-brief).
  • The team is together (in-person, remote, or hybrid) for the full Monday workshop.
  • Expert interviews are scheduled for Monday afternoon (cameo role; 15-30 minutes each).
  • The team needs to converge from "five days of work ahead" to "this specific target moment is what we're prototyping."

When NOT to Use

  • The brief is not locked. Return to tool-design-sprint-brief; without sprint questions, this skill has nothing to converge toward.
  • The challenge is so broad that "long-term goal" would be longer than 5 years. Return to problem framing.
  • The team is missing the Decider. The target-moment selection at the end of Monday is the Decider's call; without that call the team disperses Tuesday with no agreed direction.
  • The team has already pre-decided the target moment. Monday's value is in the convergence; if it's been pre-decided, Monday becomes ratification theater.

What This Skill Produces

A single bundled artifact with six sections:

  1. Long-term goal: one sentence naming success in 1-5 years. Aspirational; cannot be hit in this sprint, but should be visible from the target moment.
  2. Sprint questions: 3-7 questions converting team fears into testable risks. Phrased as "Can we... ?" or "Will... ?" or "How... ?"; NOT phrased as solutions.
  3. Customer or system map: 5-15 step flow from key player(s) at the left to outcome (long-term goal) at the right. Includes major actors, decision points, and current alternatives.
  4. Expert interview notes: synthesized observations from 2-4 cameo experts interviewed Monday afternoon. Surfaced as HMW candidates for the cluster board.
  5. HMW cluster board: 30-100+ How Might We notes from the team, clustered into 4-8 themes; voted with tool-note-and-vote heat-map mechanic to surface top clusters.
  6. Target moment: the single point on the map (or a tight cluster of points) the Decider picks as the prototyping target. Wednesday's storyboard begins from here.

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Monday artifact.

Inference Inputs

InputWhat the skill does with it
Sprint brief (from tool-design-sprint-brief)Pulls the locked sprint questions as seed for refinement; pulls the challenge statement as the long-term goal seed; pulls the team roster for role assignments in note-and-vote
Existing researchUsed to draft the customer or system map; researcher walks the team through key findings during the map step
AnalyticsQuantitative grounding for the map's decision-point branch points and abandonment moments
Customer examplesConcrete stories used to validate the map's key player and surface map-step gaps
Expert interview transcripts (run during Monday)Synthesized into HMW candidates by the moderator (typically PM or researcher) during the afternoon

Monday Time Structure

The full Monday workshop is approximately 7 hours (09:00-12:30 + 13:30-17:00). The skill's bundled artifact emerges across the day:

  • 09:00-09:30: Welcome + brief recap + introductions (does not produce artifact content)
  • 09:30-10:30: Long-term goal (one sentence) + draft sprint questions (3-7)
  • 10:30-12:30: Customer or system map draft (continuous-flow whiteboard work; team builds together)
  • 12:30-13:30: Lunch + first expert interview slot (cameo)
  • 13:30-15:30: Remaining expert interviews (3 slots; 25 min each); team captures HMWs continuously during interviews
  • 15:30-16:30: HMW cluster board synthesis; team adds final HMWs; Facilitator clusters; team heat-map votes via tool-note-and-vote
  • 16:30-17:00: Decider picks target moment; signs off; team disperses for Tuesday sketches

This skill's 105-minute timebox covers the facilitated synthesis sections (long-term goal + sprint questions + map draft + HMW clustering + target selection). Expert interviews and silent map-extension work happen in parallel and are not counted in the timebox.

Common Pitfalls

  • Long-term goal too short. "Ship Brainshelf MVP by Q3" is a roadmap goal, not a long-term goal. The long-term goal is 1-5 years out and aspirational ("Become the default way 25+/year readers remember and recall books").
  • Sprint questions phrased as solutions. "Build the camera-capture flow" is a solution; "Can we get sub-3-second capture without abandonment?" is a sprint question. The team must convert fears into questions, not predetermined answers.
  • Map too detailed. 5-15 steps, not 50. The map is for Decider orientation, not engineering documentation. If the map balloons, the Facilitator forces compression.
  • Skipping HMW because "we already know the opportunities." HMW's value is divergent surfacing followed by convergent voting. Pre-deciding the opportunities skips both halves.
  • Decider absent at target-moment selection. The whole point of Monday is the Decider's target choice. If the Decider must leave early, target selection must happen before they leave, even if HMW clustering compresses.
  • Expert interviews skipped or run by the wrong person. Experts bring outside context the team can't generate internally. Skipping them produces an inward-looking Monday. Running them as group calls (instead of small cameo conversations) wastes expert time and produces less useful HMW input.

Cross-Skill Usage

Prerequisites: tool-design-sprint-brief. Map-and-Target consumes the locked sprint brief and refines the sprint questions during the morning. Without a brief, this skill has no convergence target.

This skill invokes tool-note-and-vote twice during the day: once for HMW cluster heat-map voting (anonymous dot-voting to surface top 4-8 clusters) and optionally once for target-moment supervote when the Decider wants team input before deciding. The Decider's call is final regardless of team vote distribution.

Next invocation in the sprint: tool-design-sprint-sketch Tuesday morning.

Canonical Sources

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider's call at the end of Monday is target-moment selection: a single point (or tight cluster of points) on the customer or system map that becomes Tuesday's design target. Without that selection, Tuesday's sketches diverge with no shared direction. The Decider also confirms the long-term goal, the sprint questions, and the top HMW clusters; these become Wednesday's heat-map orientation.